Laserfiche WebLink
Inspection and Maintenance plan: <br /> The plastic covering will be monitored daily to make sure it does and blow around and will be <br /> checked within 24 hours of a rain event. <br /> Responsible Staff: <br /> Steve Roetemeyer with MiclMountain Contractors will be the onsite CESCL to maintain. <br /> Page 118 <br />