My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 45-12 2016-10-20
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 45-12
>
3003 W CASINO RD BLDG 45-12 2016-10-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2018 11:18:20 AM
Creation date
10/20/2016 11:07:00 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 45-12
Notes
GEOTECHNICAL REPORT INCLUDED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1) Just in time delivery <br /> 2) Mobile Materials <br /> 3) Bulk material handling <br /> 4) Eliminating excess packaging brought to site <br /> 5) Efficient disposal/debris removal <br /> Laydown and storage will be authorized by the HCC superintendent. Unauthorized storage of <br /> material will not be tolerated. Housekeeping is an important issue on our projects. Each <br /> subcontractor will be responsible to control and remove any materials or debris created by work <br /> performed by their employees. <br /> All containers will be clearly labeled to identify the product contained in them. The integrity of <br /> labels on original containers is to be maintained. This includes secondary containers. <br /> Secondary containers are to have appropriate labels that include product identification and <br /> hazard warnings. <br /> All chemical liquids, fluids, and petroleum products will be stored on an impervious surface that <br /> is contained. Hazardous materials will be stored in covered/enclosed containers and clearly <br /> labeled. If hazardous materials are brought on site the Boeing Onsite Activity Representative <br /> will be notified and coordinated with. Secondary containment will be provided for any transfer of <br /> hazardous materials and storage of hazardous materials with a minimum capacity to contain <br /> 110% of the volume of the largest container. Flammable liquids/chemicals will be stored in <br /> flammable containers and kept at a minimum of 20 ft. away from ignition sources. Daily <br /> inspections will be done on all secondary containment areas to ensure no leaks are taking <br /> place. <br /> MSDS sheets will be required to be provided with all liquids and chemicals onsite. The MSDS <br /> sheets will be provided to the Hoffman Superintendent a minimum of 2 weeks prior to any work <br /> with the product on the project. MSDS sheets will be kept in Adam Bonners office, at area of <br /> work if needed, and at the communication board. <br /> • Material Delivery, Storage and Containment (BMP C153) <br /> Concrete and grout production shall conform to the following BMPs: <br /> • Concrete Handling (BMP C151) <br /> • Saw cutting and Surface Pollution Prevention (BMP C152) <br /> Wheel Wash shall conform to the following BMP: <br /> • Wheel Wash (BMP C106) <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.