Laserfiche WebLink
• Construction Stormwater Filtration (BMP C251) <br /> Installation Schedules: The Stormwater Chemical Treatment will be installed at the start of <br /> construction and will last the duration of the project. <br /> Inspection and Maintenance plan: <br /> Clear water will be onsite to manage and inspect the chemical treatment system on a weekly <br /> basis. Clear water will be the only ones to discharge water from the system in accordance with <br /> the Administrative Order issued by the Washington State Department of Ecology. <br /> Responsible Staff: <br /> Nate Holloway with Clear Water Compliance will be the certified operator for Stromwater <br /> Chemical Treatment (BMP C250) and will be responsible for operation and maintenance. <br /> 1 28 <br />