My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 45-12 2016-10-20
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 45-12
>
3003 W CASINO RD BLDG 45-12 2016-10-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2018 11:18:20 AM
Creation date
10/20/2016 11:07:00 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 45-12
Notes
GEOTECHNICAL REPORT INCLUDED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.1.11 Element 11: Maintain BMPs <br /> This section is a list of permit requirements and does not have to be filled out. <br /> All temporary and permanent Erosion and Sediment Control (ESC) BMPs shall be maintained <br /> and repaired as needed to ensure continued performance of their intended function. <br /> Maintenance and repair shall be conducted in accordance with each particular BMP <br /> specification (see Volume 11 of the SWMMWW or Chapter 7 of the SWMMEM. <br /> Visual monitoring of all BMPs installed at the site will be conducted at least once every calendar <br /> week and within 24 hours of any stormwater or non-stormwater discharge from the site. If the <br /> site becomes inactive and is temporarily stabilized, the inspection frequency may be reduced to <br /> once every calendar month. <br /> All temporary ESC BMPs shall be removed within 30 days after final site stabilization is <br /> achieved or after the temporary BMPs are no longer needed. <br /> Trapped sediment shall be stabilized on-site or removed. Disturbed soil resulting from removal <br /> of either BMPs or vegetation shall be permanently stabilized. <br /> Additionally, protection must be provided for all BMPs installed for the permanent control of <br /> stormwater from sediment and compaction. BMPs that are to remain in place following <br /> completion of construction shall be examined and restored to full operating condition. If <br /> sediment enters these BMPs during construction, the sediment shall be removed and the facility <br /> shall be returned to conditions specified in the construction documents. <br /> Page 129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.