Laserfiche WebLink
STATIC TEST FACILITY PRELIMINARY STORM DRAINAGE REPORT <br /> EVERETT,WASHINGTON <br /> During the wet season (October 1 to April 30) any site with exposed soils shall be subject to <br /> the "Wet Season Requirements" contained in the ESC Standards. In addition to the ESC <br /> cover measures, these provisions include covering any newly-seeded areas with mulch and <br /> seeding as much disturbed area as possible during the first week of October to provide <br /> grass cover for the wet season. Other ESC measures such as baker tanks and portable <br /> sand filters may be required for use during the wet season. A separate "Wet Season" ESC <br /> plan shall be submitted and approved by the City before continuing work on any site during <br /> the wet season. <br /> Prior to obtaining final construction approval, the site shall be stabilized, structural ESC <br /> measures (such as silt fences and sediment traps) shall be removed, and drainage facilities <br /> shall be cleaned as specified in the ESC Standards. A separate ESC plan describing final <br /> stabilization shall be submitted and approved by the City prior to implementation. <br /> CEI Project#141001 Pg. 16 <br />