My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/10/12 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/10/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 11:31:07 AM
Creation date
10/20/2016 11:30:37 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/12/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> :111 • ERETT - PUBLIC WORKS DEPARTMENT <br /> CITY OF EV <br /> 1 TRANSMISSION LINE 5 REPLACEMENT CROSSING PILCHUCK RIVER <br /> 4. <br /> DESIGN-BUILD PROJECT <br /> • <br /> ,PGO bAlt <br /> p� SCOP - aMOIST S xuS <br /> tl6 <br /> t a <br /> ___ <br /> 1 <br /> PROJECT <br /> ;—PROJECT • t \14:111LOCATION <br /> li.l...11.1,0.LOCATION <br /> I ill' <br /> I <br /> — _ ____—• I BBOHOM F <br /> — VICINITY MAP <br /> - <br /> J • <br /> CITY OFFICIALS; .— <br /> r V " MAYOR: <br /> _ BRAY STEPHANSON <br /> THREE LAKES ROAD j COUNCIL MEMBERS: <br /> COUNCIL PRESIDENT <br /> JEFF MOORE <br /> ' - V - I i PAUL ROBERTS RONGIPSON <br /> BFTAIWNON AFPH04TER SOOTT'BAIEEE <br /> • <br /> SSOTTMURPHY ERENIWA STONECIPNER <br /> • SHEET INDEX SHEET INDEX RECOMMENDED FOR APPROVAL: <br /> SHT# DESCRIPTION SHT# DESCRIPTION <br /> 1 0.001 COVER 0-151 SITE PLAN P((09ECT ENGINBfiR M INTENANOE 9DPERINTENOENT <br /> G-002 ABBREVIATIONS,LEGEND AND GENERAL NOTES <br /> 0-102 PIPELINE PLAN AND PROFILE RIOHARO GNGiN ER MAE168AOLER,P.E <br /> G-003 SITE PLAN,TESC,ACCESS PLAN C-109 PIPE TRENCH DETAILS <br /> 0.004 EROSION AND SEDIMENT CONTROL PLAN C-104 PIPELINE DETAILS, I <br /> 0.086 SURVEY CONTROL AND EXISTING CONDITIONS LASS PIPELINE DETAILS • <br /> 0-006 PHASE 1-STAOING,.EAST PIPELINE CONSTRUCTION C-156 DECHLORINATION VAULT <br /> 6.007 PHASE 2-TEMPORARY BY-PASS AND.WESTPIPELINE CONSTRUCTION C-107 DECHLORINATION VAULT PLANATIDPEOPN0NpuRUGI1ON'MANAOER <br /> LE ITOMpuma <br /> 0-S08 PHASE 3-IN-WATER WORK C-108 DECHLORINATIOTVAULT DETAILS I <br /> 0-580 PHASE 4-TESTIt4G,WATERMAIN CONNECTIONS AND RESTORATION 0-105 TEMPORARY BY-PASS CHANNEL PLAN,PROFILE AND SECTION APPROVED BY: <br /> III o0'10 PLANTING PLAN <br /> C-011 PLAJIING AND RESTORATION DETAILS <br /> SHANNONAILbN,INC. TETRA TECH IENGINEERING$NPERIf0ENOENT PUBLIOWORI<SEIREOT.OR <br /> CITY OF EVERETT -����1e ren.. EZI IJAMES W.MILLER,WE <br /> EAVE EAVI9,PSE, <br /> ;d40—,,,,, PUBLIC.WORKS W ..wmmmm DEPARTMENT �"J COLLT.CCIO 1vSBmBTBEETSI eenS <br /> - BFATREW/SHINATON 08101 <br /> CONSTRUCTION [NONB4➢BE90.V]BBFA%:2B6BB3S3n1 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.