Laserfiche WebLink
} <br /> EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 5 <br /> PROJECT TITLE: <br /> Certification of Completion for Briefing COUNCIL BILL# <br /> the Evergreen Way Pedestrian Proposed Action Originating Department Public Works <br /> Walkway Project with Kamins Consent Contact Person Tom Fuchs <br /> Construction Action Phone Number 425-257-8931 <br /> First Reading FOR AGENDA OF October 12, 2016 <br /> Second Reading <br /> Third Reading <br /> Public Hearing Initialed by: <br /> Budget Advisory Department Head <br /> • <br /> CAA <br /> Council President �,�! <br /> Location Preceding Action Attachments Department(s)Approval <br /> 9/1/2015 Bid Final Contract Voucher Certification, Public Works <br /> 10/7/2015 Award Certificate of Completion,Final <br /> 1/29/2016C0#1 Contract Estimate Voucher, Location <br /> 4/15/2016 CO#2 Map <br /> Amount Budgeted $267,581.70 Account Number: WO#PW 3466 <br /> Expenditure Required $267,131.16 <br /> Budget Remaining $450.54 <br /> Additional Required -0- <br /> 9 <br /> DETAILED SUMMARY STATEMENT: <br /> The Evergreen Way Pedestrian Walkway Project involved street improvements including sidewalk, curb and <br /> gutters, driveways, storm drainage, catch basins, concrete inlets, adjustment of manholes and catch basins, <br /> and other necessary work. <br /> The general contractor, Kamins Construction, completed the Evergreen Way Pedestrian Walkway Project in <br /> accordance with the plans and specifications and to the satisfaction of the Public Works Department. <br /> Original Contract Amount: $233,268.05 <br /> Change Orders 1-2: $34,313.65 <br /> Total Contract Amount: $267,581.70 <br /> A bond was provided in lieu of retainage $0.00 <br /> Contract total paid to date: $267,131.16 <br /> RECOMMENDATION (Exact action requested of Council): <br /> Accept the Evergreen Way Pedestrian Walkway Project as complete and authorize the Mayor to sign the <br /> Certificate of Completion with Kamins Construction rotasing the retainage bond. <br />