My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3530 FEDERAL AVE 2016-10-20
>
Address Records
>
FEDERAL AVE
>
3530
>
3530 FEDERAL AVE 2016-10-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 1:53:14 PM
Creation date
10/20/2016 1:53:11 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
3530
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Supports for solar modules are Installed to spread the dead load across as many roof- <br /> framing members as needed to ensure that no point load exceeds fifty(50)pounds, ✓❑ ❑IRC M2302.2.1(5)] <br /> 12. The photovoltaic modules and supporting structure shall be constructed of <br /> noncombustible materials or fire-retardant treated wood equivalent to that required for ✓❑ Q <br /> the roof construction. [iRC M2302.2.11 <br /> 13, Roof and wall penetrations shall be flashed and sealed to prevent entry of water, Elrodents,and insects.[iRC M2302.2.2] <br /> 14. PV modules are listed and labeled with a fire classification in accordance with UL 1703, El <br /> M2302.2,31 <br /> Comments: <br /> If you answered yes to all of the above questions,the project qualifies for the over-the- <br /> counter permitting process. <br /> i <br /> Determine if your project qualifies for an Over-the-Counter electrical permit <br /> Yes No N/A <br /> 1. PV modules,Inverters,and combiner boxes are identified for use In PV systems. ❑ <br /> 2, The Inverters are listed and labeled In accordance with UL 1741 and are listed for Q <br /> utility Interaction. [IRC M2302.41 <br /> 3. The AC Interconnection point is on the load side of service disconnect. [NEC 690.64(13)] <br /> 4. The system meets all current NEC,City and Washington Cities Electrical Code 21 ❑ <br /> requirements, <br /> 5. For Split-Buss modules the AC interconnection must be one of the six service 0 Q <br /> disconnects. <br /> 6. Maximum load added to the panelboard Is based on the rating of the panelboards bus/main OCPD <br /> combination in accordance with NEC 705,12(1))(20)(b),and Is limited to(check combination that <br /> applies): <br /> ❑225 amp bus/200 amp main OCPD-13,440 AC watts,maximum 70 amp inverter OCPD. <br /> ❑225 amp bus/225 amp main OCPD- 8,640 AC watts,maximum 45 amp inverter OCPD. <br /> E1200 arnp bus/200 amp main OCPD- 7,860 AC watts,maximum 40 amp Inverter OCPD. <br /> 1:1150 amp bus/150 amp main OCPD- 5,760 AC watts,maximum 30 amp inverter OCPD. <br /> ❑125 amp bus/125 amp main OCPD- 4,800 AC watts,maximum 25 amp inverter OCPD. <br /> ❑125 amp bus/100 amp main OCPD- 9,600 AC watts,maximum 50 amp Inverter OCPD. <br /> 6' <br />
The URL can be used to link to this page
Your browser does not support the video tag.