Laserfiche WebLink
s, <br /> 0100 amp bus/100 amp main OCPD- 3,840 AC watts,maximum 20 amp Inverter OCPD, <br /> OOther-Electrical Permit with Plan Review Required <br /> Note 1:k1sted un-altered factory mole/bus combination.Alteration of the ponelboard main OCPD will require plan review. <br /> Note 2:The circuit conductors and overcurrent devices shall be sized to carry not less than 125 percent of the maximum currents <br /> ds calculated in 690.8(A).The roting or setting of overcurrent devices shall be permitted In accordance with 240.4(8)and(C).NEC <br /> 690.8(8)(1) <br /> Note 3:If a ponelboard employs a snap switch rated 30 amperes or less In any branch circuit,It cannot be rated more than 200 <br /> amperes unless there Is a supply side overcurrent protection at 200 amperes or less within the pan elboard.Thls requirement does <br /> not apply to ponelboards equipped with circuit breakers.Section 408.36(A)of the NEC. <br /> T 1 have attached the following Electrical one-Line Diagram: <br /> ❑Standard Electrical Diagram-6 Strings or Less <br /> ✓ltandard Electrical Diagram-4 Strings or Less <br /> OStandard Electrical Diagram-Micro Inverter <br /> []None of the above-Electrical Permit with Plan Review Required <br /> Comments: <br /> If you answered yes to all of the above questions,your project qualifies for over the Over-the- <br /> Counter electrical permit. <br /> 5 - <br /> I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws <br /> and ordinances governing this type of work will be completed whether specified herein or not. The granting of a permit does <br /> not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the <br /> performance of construction. That I am authorized by the owner of this property to perform the work for which application is <br /> made and I comply with the State Contractors Law 18.27 RCW and 296.200 WAC. <br /> Applicant Signature: �2Crr � Date: 7/11/201 <br /> i <br /> Applicant ane(Please Print): Marisa Mora-Zapata <br /> ---------TO BE COMPLETED BY CITY STAFF------ <br /> nua"'e"orOTCB" <br /> ilding Permit? OYes ONo Permit Appicationitials Date: <br /> Qualifles for Electrical OTC? Byes 11 No Permit h: <br /> Stafflnlfials Date: <br /> i <br />