Laserfiche WebLink
`t PU®L/C WORKS <br /> February 5, 2015 <br /> Renaissance Builders <br /> 15425 Grant Rd <br /> Arlington, WA 98223 <br /> Subject: Project: Maki <br /> Job Address: 1002 Mukilteo Blvd <br /> Plan Check No: B1501-007 <br /> Dear Mr. Degraffenreid: <br /> In response to your application for a construction permit, your plans have been examined and <br /> you are advised that the issuance of a permit is being withheld for the reasons listed below. <br /> These comments address building issues only. Additional revisions or additions may be <br /> required by other departments (such as Utilities, Planning or Fire). All references refer to the <br /> (2012 International Building Code,) (2012 International Residential Code,) as amended by the <br /> State of Washington and/or Washington State Energy Code 2012 Edition, and adopted by the <br /> City of Everett, unless stated otherwise. <br /> In order for the processing of your application to continue, it will be necessary to <br /> provide the Building Division with two new complete sets of drawings reflecting the <br /> corrections requested, along with a reduced set of plans no larger than 11"x 17". <br /> 1. Provide lateral analysis for wind and seismic loading prepared by a licensed WA state <br /> structural engineer. <br /> 2. Show how 6 x 12 beams are supported at the existing house. <br /> 3. Provide post/beam/post connection detail for 6 x 6 posts supporting new roof. <br /> 4. Specify size of existing beam supporting existing deck load and new deck load. Verify <br /> gravity loads on existing beam. <br /> 5. Provide detail of guard construction showing all components. <br /> 6. Provide detail of the connection of the new deck joists to the existing deck structure. <br /> Please prepare a response letter showing where each item in this correction letter is <br /> addressed on the plan set. <br /> CITY OF EVERETT• 3200 Cedar Street • Everett, WA 98201 • (425)257-8800 • Fax (425) 257-8882 <br /> S:\iCommon\Clerical\3Heilman\61501-007(1002 Mukilteo Blvd).doc <br />