Laserfiche WebLink
0 0 <br /> Upon resubmittal of the drawings, your application will be given priority and plan review will <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to ensure <br /> that the proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> Jeff Hellman <br /> Development Technician <br /> 425-257-8976 <br /> Email: jheilman@ci.everett.wa.us <br /> S:\lCommon\Clerical\]Heilman\B1501-007(1002 Mukilteo Blvd).doc <br />