Laserfiche WebLink
02-q <br /> Building Height Handout-Page 4 of 4 <br /> City of Everett,WA <br /> Height Survey <br /> (For Surveyor Use Only IF a survey is required. Instructions:Complete this form prior to the framing inspection. This <br /> form will need to be provided to the City inspector at the framing inspection.Contact the Planning Department at <br /> 425.257.8731 if the structure does not meet the height limit.) <br /> Date of Survey: A 7 PERMIT# ' - <br /> Property Location Surveyed: ��-5- 12%� s��/�J��5-53 1 1 Z61 WO <br /> (address and/or parcel#) <br /> Description of Bench Mark: n�- <br /> Bench Mark Elevation: u)a" <br /> Fill in the information from the araproved Base Elevation Survev for Box I or 2 and complete Box 3) <br /> A= $` 4i.�� BOX I BdX 2 <br /> B= !75,f) <br /> C= Highest point of the sidewalk <br /> A+B+C+D_ j 4= a�Average Base Elev. EL <br /> *Submit a map showing the <br /> +Maximum Height of ZO (feet) location of the highest point of <br /> = Maximum'Elevation Allowed the sidewalk. <br /> BOX 3 _ <br /> Actual Elevation*: (elev.) Height of Structure*: 6y . (feet) <br /> *Measure from the average base elevation to the roof peak or from the sidewalk to top of roof. <br /> Check: <br /> 1, s - A_,ti�;e 5' certify that I measured the height of the structure from <br /> the, approved average base elevation/ ❑ highest point of sidewalk to the top of the <br /> ridge/roof.The structure Ameets the height limit/❑ doesn't meet the height limit. <br /> Signature of Surveyor <br /> Company —_ f�a 5�; ��C� ® ® AS � <br /> Address <br /> -1317 tq <br /> +r t <br /> t a a -S. 90711 <br /> ��– <br /> Phone/Email -3,-%� -.9� ���� � 6�.' �0 <br />