My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3090-08
>
Ordinances
>
Ordinance 3090-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2016 11:04:30 AM
Creation date
10/31/2016 11:04:17 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3090-08
Date
8/20/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. The SEIS identifies potential measures to mitigate these impacts and assure <br /> compatibility with uses on other properties. PEMC, in response to public and <br /> Planning Department comments, has prepared a revised "Master Plan for the ECC <br /> Property." The June 30, 2008 Staff Report identified additional changes to the <br /> PEMC revised master plan to mitigate impacts. <br /> 12. During the public hearings conducted by the Planning Commission there was <br /> testimony both supporting and opposing the proposed expansion to the ECC <br /> property. <br /> 13. Representatives of Everett Community College testified in support of PEMC's <br /> proposed expansion. The proposed land transaction between ECC and PEMC <br /> will allow ECC to plan for and accommodate its long-term future growth on the <br /> adjacent land in the North Broadway area that it will acquire from PEMC. ECC <br /> will replace the physical education facilities currently on the ECC Property with <br /> new facilities closer to its current North Broadway campus. <br /> 14. Based on PEMC's 2007 Application, additional information presented by PEMC <br /> following the June 2, 2008 Planning Commission hearing,public testimony and <br /> the recommendations included in the Staff Report, expansion to the ECC Property <br /> is the best alternative to meet PEMC's long-term patient needs in terms of cost, <br /> timing, certainty, and operational efficiencies. <br /> 15. To achieve the requested land use changes, the City Council must (a) amend the <br /> Comprehensive Plan land use map designation for the ECC Property from <br /> College (2.2) to Hospital (2.4); (b) rezone the ECC Property from R-2 (Single <br /> Family) to R-2-I (Institutional Overlay); and (c) approve PEMC's Master Plan for <br /> the ECC Property, as amended with the Staff and Planning Commission <br /> recommended revisions contained in Exhibit A. <br /> 16. The PEMC Master Plan for the ECC Property contained in Exhibit A provides a <br /> plan for developing facilities to meet patient needs, including construction of a <br /> Utility Building to support the hospital and medical facilities on the existing <br />
The URL can be used to link to this page
Your browser does not support the video tag.