Laserfiche WebLink
• <br /> The minimum utility connection fee shall be the fee charged for a water demand of 200,000 cu. ft. <br /> per month at $1,704 per 900 cu. ft. per month. Approval of the Mayor is required for all connection fees <br /> determined under this provision. <br /> • <br /> Section 2. Effective January 1, 2010 <br /> Section 2.1: <br /> Land Use Connection Type Unit&Quantity Water Sewer Total <br /> Single Family Inside City Limits' 1 Dwelling Unit $986 $1,531 $2,517 <br /> (less than 1,000 sq ft <br /> Single Family Inside City Limits' 1 Dwelling Unit $1,159 $1,804 $2,963 <br /> (1,000-2,000 sq ft) <br /> Single Family Inside City Limits' 1 Dwelling Unit $1,442 $2,245 $3,687 <br /> (over 2,000 sq ft) <br /> Duplex Inside City Limits' 2 Dwelling Units $1,685 $2,622 $4,307 <br /> (Per Unit) <br /> Triplex Inside City Limits' 3 Dwelling Units $2,238 $3,481 $5,719 <br /> (Per Unit) <br /> Multi Family Inside City Limits' 4+Dwelling Units $745 $1,161 $1,906 <br /> (Per Unit) <br /> Mobile Home Inside City Limits' Each Mobile Home Unit $835 $1,324 $2,159 <br /> Comm/Industrial Inside City Limits' Single Family Equivalent $928 $1,443 $2,371 <br /> Areas outside City limits,but connected to the City's water distribution system shall be charged the rate inside City limits with a 25% <br /> surcharge. <br /> Section 2.2: The said connection charges shall be assessed based on the number of units to be <br /> connected, regardless of whether the units are connected to the public water or sewer system line in <br /> common or individually. <br /> Section 2.3: The Utilities Director shall establish rules, regulations and procedures for administration <br /> of said fees established for system connections. <br /> Section 2.4: In the event that the proposed improvement on property to be connected to the Everett <br /> sewer system constitutes a major project under SEPA guidelines, the Mayor or his designee may use the <br /> fees established herein as a guideline for mitigation of sewer and water system impacts. <br /> Section 2.5: Charges for new projects with an estimated water demand in excess of 200,000 cu. ft. per <br /> month shall be determined on a case-by-case basis related to its immediate short term and long term impact <br /> on the sewer and water systems. Said determinations shall use $2,371 per 900 cu. ft. per month of estimated <br /> water demand to calculate the total charge. The total charge may be reduced or increased based on the <br /> following considerations: <br /> A. Proximity to the sewage treatment plant. <br /> B. Pumping requirements to supply water to the proposed development. <br /> C. Pumping requirements to convey the proposed development's sewage effluent to the sewage <br /> treatment plant. <br />