Laserfiche WebLink
Section 5.4: In the event that the proposed improvement on property to be connected to the Everett <br /> sewer system constitutes a major project under SEPA guidelines, the Mayor or his designee may use the <br /> fees established herein as a guideline for mitigation of sewer and water system impacts. <br /> Section 5.5: Charges for new projects with an estimated water demand in excess of 200,000 cu. ft. per <br /> month shall be determined on a case-by-case basis related to its immediate short term and long term impact <br /> on the sewer and water systems. Said determinations shall use$4,371 per 900 cu. ft. per month of estimated <br /> water demand to calculate the total charge. The total charge may be reduced or increased based on the <br /> following considerations: <br /> A. Proximity to the sewage treatment plant. <br /> B. Pumping requirements to supply water to the proposed development. <br /> C. Pumping requirements to convey the proposed development's sewage effluent to the sewage <br /> treatment plant. <br /> D. System improvements to be made by the developer. <br /> E. Peak demand for water. Peak flow for sewer. <br /> F. Fire demand. <br /> G. Estimated sewage effluent quality. <br /> H. Proximity to the water filtration plant. <br /> I. Location outside the City limits. <br /> The minimum utility connection fee shall be the fee charged for a water demand of 200,000 cu. ft. <br /> per month at$4,371 per 900 cu. ft. per month. Approval of the Mayor is required for all connection fees <br /> determined under this provision. <br /> Section 6. Effective January 1, 2014 <br /> Section 6.1: <br /> Land Use Connection Type Unit&Quantity Water Sewer Total <br /> Single Family Inside City Limits' 1 Dwelling Unit <br /> (less than 1,000 sq ft $2,136 $3,212 $5,348 <br /> Single Family Inside City Limits' 1 Dwelling Unit <br /> (1,000-2,000 sq ft) $2,512 $3,784 $6,296 <br /> Single Family Inside City Limits' 1 Dwelling Unit <br /> (over 2,000 sq ft) $3,127 $4,709 $7,836 <br /> Duplex Inside City Limits' 2 Dwelling Units <br /> (Per Unit) $3,654 $5,498 $9,152 <br /> Triplex Inside City Limits' 3 Dwelling Units <br /> (Per Unit) $4,852 $7,302 $12,154 <br /> Multi Family Inside City Limits' 4+Dwelling Units <br /> (Per Unit) $1,615 $2,436 $4,051 <br /> Mobile Home Inside City Limits' Each Mobile Home Unit $1,746 $2,668 $4,414 <br /> Comm/Industrial Inside City Limits' Single Family Equivalent $2,012 $3,026 $5,038 <br /> Areas outside City limits,but connected to the City's water distribution system shall be charged the rate inside City limits with a 25% <br /> surcharge. <br />