My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3095-08
>
Ordinances
>
Ordinance 3095-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2016 11:29:36 AM
Creation date
10/31/2016 11:29:32 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3095-08
Date
9/24/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Section 4.5: Charges for new projects with an estimated water demand in excess of 200,000 cu. ft. per <br /> month shall be determined on a case-by-case basis related to its immediate short term and long term impact <br /> on the sewer and water systems. Said determinations shall use $3,704 per 900 cu. ft. per month of estimated <br /> water demand to calculate the total charge. The total charge may be reduced or increased based on the <br /> following considerations: <br /> A. Proximity to the sewage treatment plant. <br /> B. Pumping requirements to supply water to the proposed development. <br /> C. Pumping requirements to convey the proposed development's sewage effluent to the sewage <br /> treatment plant. <br /> D. System improvements to be made by the developer. <br /> E. Peak demand for water. Peak flow for sewer. <br /> F. Fire demand. <br /> G. Estimated sewage effluent quality. <br /> H. Proximity to the water filtration plant. <br /> I. Location outside the City limits. <br /> The minimum utility connection fee shall be the fee charged for a water demand of 200,000 cu. ft. <br /> per month at $3,704 per 900 cu. ft. per month. Approval of the Mayor is required for all connection fees <br /> determined under this provision. <br /> Section 5. Effective January 1, 2013 <br /> Section 5.1: <br /> Land Use Connection Type Unit&Quantity Water Sewer Total <br /> Single Family Inside City Limits' 1 Dwelling Unit <br /> (less than 1,000 sq ft $1,849 $2,792 $4,641 <br /> Single Family Inside City Limits' 1 Dwelling Unit <br /> (1,000-2,000 sq ft) $2,174 $3,289 $5,463 <br /> Single Family Inside City Limits' 1 Dwelling Unit <br /> (over 2,000 sq ft) $2,706 $4,093 $6,799 <br /> Duplex Inside City Limits' 2 Dwelling Units <br /> (Per Unit) $3,162 $4,779 $7,941 <br /> Triplex Inside City Limits' 3 Dwelling Units <br /> (Per Unit) $4,199 $6,347 $10,546 <br /> Multi Family Inside City Limits' 4+Dwelling Units <br /> (Per Unit) $1,398 $2,117 $3,515 <br /> Mobile Home Inside City Limits' Each Mobile Home Unit $1,518 $2,332 $3,850 <br /> Comm/Industrial Inside City Limits' Single Family Equivalent $1,741 $2,630 $4,371 <br /> Areas outside City limits,but connected to the City's water distribution system shall be charged the rate inside City limits with a 25% <br /> surcharge. <br /> Section 5.2: The said connection charges shall be assessed based on the number of units to be <br /> connected, regardless of whether the units are connected to the public water or sewer system line in <br /> common or individually. <br /> Section 5.3: The Utilities Director shall establish rules, regulations and procedures for administration <br /> of said fees established for system connections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.