Laserfiche WebLink
Heidi Davis <br /> From: Michael Brick <br /> Sent: Wednesday, September 17, 2014 2:14 PM <br /> To: Heidi Davis <br /> Subject: RE: Powder Mill fees <br /> Heidi, <br /> For the permits to construct Building A and Building B on this site (for a combined total of 227,805 SF of new <br /> construction) a Traffic Mitigation Fee of$82,492.00 is due for this project. If the building permits for these two buildings <br /> need to be separated let me know and I will separate the traffic mitigation fees between the two buildings. <br /> Let me know if you have any questions, <br /> Sincerely, <br /> Michael <br /> From: Heidi Davis <br /> Sent: Wednesday, September 17, 2014 1:38 PM <br /> To: Michael Brick <br /> Subject: FW: Powder Mill fees <br /> Michael, can you give me something in writing that shows it's ok for them to pay only the traffic mitigation fees listed at <br /> this point? Thanks! <br /> Heidi Davis <br /> City of Everett <br /> Permit Services <br /> www.everettwa.ory <br /> 425.257.8810 <br /> From: Donnie Belk [mailto:DBelk@panattoni.com] <br /> Sent: Wednesday, September 17, 2014 1:19 PM <br /> To: Heidi Davis <br /> Cc: Andrew Repass; Bob Graff <br /> Subject: RE: Powder Mill fees <br /> Hi Heidi, <br /> We were able to review the traffic fees with Mike and generated a memo for him. I have attached the revised fees due <br /> and the traffic memo. I will have check(s) cut for these amounts. <br /> I hope to have the check to you by tomorrow or Friday at the latest. <br /> Thank you! <br /> 1 <br />