My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 4
>
Contracts
>
Capital Contract
>
Change Order No. 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2016 9:41:55 AM
Creation date
5/20/2016 9:41:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons, Inc.
Approval Date
5/9/2016
Council Approval Date
4/20/2016
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Riverfront Development Sanitary Sewer LS Impv
Public Works WO Number
RD3314-21, UP 3597-3
Amendment/Change Order
Change Order
Amendment/Change Order Number
4
Total Compensation
$54,899.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Riverfront Development Sanitary Sewer <br /> Lift Station Improvements <br /> Change Order No.4 <br /> Change Order Effective Date: March 28, 2016 <br /> Date: ¢/4.//i, Date: Date: Date: <br /> CONTRA •R <br /> By 41Ih Date: 3/2-Y(q W <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> This change order# 4 adds two (2)new bid items to Schedule "A" and one (1) new bid item to <br /> Schedule "B" as shown below. <br /> Added Bid Items <br /> Schedule "A" Bid Item #203–Lift Station 33 Pipe Modifications. Add new bid item#203, <br /> entitled "Lift Station 33 Pipe Modifications" at the agreed to lump sum price of$22,605.12, resulting <br /> in a$22,605.12 increase to the contract price. <br /> Schedule "A" Bid Item #204–Additional Dewatering Costs for Lift Station 33 Piping. Add new <br /> bid item#204, entitled"Additional Dewatering Costs for Lift Station 33 Piping" at the agreed to lump <br /> sum price of$12,637.24, resulting in a$12,637.24 increase to the contract price. <br /> Schedule "B" Bid Item # 106–Lift Station 43 Pipe Modifications. Add new bid item# 106, <br /> entitled"Lift Station 43 Pipe Modifications" at the agreed to lump sum price of$19,657.27, resulting <br /> in a$19,657.27 increase to the contract price. <br /> Exhibit B—Justification <br /> Schedule "A" Bid Item #203–Lift Station 33 Pipe Modifications. The design engineer added <br /> piping and connections to the LS 33 piping to increase system flexibility to avoid damage to City of <br /> Everett facilities due to risk of long term settlement. This bid item is being added to account for costs <br /> to pay for additional piping work at Lift Station 33. <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.