Laserfiche WebLink
Project: Riverfront Development Sanitary Sewer <br /> Lift Station Improvements <br /> Change Order No.4 <br /> Change Order Effective Date: March 28, 2016 <br /> Date: ¢/4.//i, Date: Date: Date: <br /> CONTRA •R <br /> By 41Ih Date: 3/2-Y(q W <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> This change order# 4 adds two (2)new bid items to Schedule "A" and one (1) new bid item to <br /> Schedule "B" as shown below. <br /> Added Bid Items <br /> Schedule "A" Bid Item #203–Lift Station 33 Pipe Modifications. Add new bid item#203, <br /> entitled "Lift Station 33 Pipe Modifications" at the agreed to lump sum price of$22,605.12, resulting <br /> in a$22,605.12 increase to the contract price. <br /> Schedule "A" Bid Item #204–Additional Dewatering Costs for Lift Station 33 Piping. Add new <br /> bid item#204, entitled"Additional Dewatering Costs for Lift Station 33 Piping" at the agreed to lump <br /> sum price of$12,637.24, resulting in a$12,637.24 increase to the contract price. <br /> Schedule "B" Bid Item # 106–Lift Station 43 Pipe Modifications. Add new bid item# 106, <br /> entitled"Lift Station 43 Pipe Modifications" at the agreed to lump sum price of$19,657.27, resulting <br /> in a$19,657.27 increase to the contract price. <br /> Exhibit B—Justification <br /> Schedule "A" Bid Item #203–Lift Station 33 Pipe Modifications. The design engineer added <br /> piping and connections to the LS 33 piping to increase system flexibility to avoid damage to City of <br /> Everett facilities due to risk of long term settlement. This bid item is being added to account for costs <br /> to pay for additional piping work at Lift Station 33. <br /> Page 3 of 4 <br />