Project: Riverfront Development Sanitary Sewer <br /> Lift Station Improvements <br /> Change Order No.4 <br /> Change Order Effective Date: March 28, 2016 <br /> Schedule "A" Bid Item #204—Additional Dewatering Costs for Lift Station 33 Piping. During <br /> the time the contractor was procuring additional piping materials to construct the pipe modifications at <br /> Lift Station 33,the contractor incurred additional operational costs related to this delay. This bid item <br /> is being added to account for costs to pay for dewatering equipment while procuring materials for <br /> added piping work. <br /> Schedule "B" Bid Item # 106—Lift Station 43 Pipe Modifications. The design engineer added <br /> piping and flexible expansion joints to the piping at Lift Station 43 to accommodate the steel sheet <br /> piles that will remain in the ground at Lift Station 43. The added flexible joints and pipe modifications <br /> will minimize risk of damage to City of Everett facilities resulting from long term settlement. <br /> This Change Order#4 results in an increase to the Contract price of$54,899.63. <br /> Exhibit C—Contract Time: There are 30 working days added to this contract via Change Order <br /> # 4 to account for delays caused while the contractor acquired additional pipe materials. <br /> Page 4 of 4 <br />