My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> I <br /> 1 Retainage 73 <br /> 2 TEMPORARY TRAFFIC CONTROL 74 <br /> 3 TRAFFIC CONTROL MANAGEMENT 74 <br /> 4 General 74 <br /> 5 MEASUREMENT 75 <br /> 6 Reinstating Unit Items With Lump Sum Traffic Control 75 <br /> 7 CONSTRUCTION REQUIREMENTS 77 <br /> 8 (February 17, 1998) 77 <br /> 9 Removal of Obstructions 77 <br /> 10 (August 1,2005) 77 <br /> 11 Removal and Disposal of Hazardous Material 77 <br /> 12 Contaminated Soil and Hazardous Material 78 <br /> 13 Contaminated Water 78 <br /> 14 MEASUREMENT 78 <br /> 15 PAYMENT 78 <br /> 16 2-02.5 PAYMENT 79Il <br /> 17 ROADWAY EXCAVATION AND EMBANKMENT 79 <br /> 18 PAYMENT 80 <br /> 19 4-04.1 DESCRIPTION 81 <br /> 111 <br /> 20 HOT MIX ASPHALT 83 <br /> 21 MATERIALS 83 <br /> 22 (January 3,2011) 83 <br /> 23 ESAL's 83 <br /> 24 Planing Bituminous Pavement 85 <br /> 25 Weather Limitations 86 <br /> 26 PAYMENT 86 <br /> 27 (August 5,2013) 86 <br /> 28 Asphalt Cost Price Adjustment 86 <br /> 29 STRUCTURAL EARTH WALLS 89 <br /> 30 MATERIALS 89 <br /> 31 (August 3,2015) 89 <br /> 32 Concrete Block Faced Structural Earth Wall Materials 89 <br /> I <br /> 33 CONSTRUCTION REQUIREMENTS 92 <br /> 34 (August 3,2015) 92 <br /> 35 Concrete Block Faced Structural Earth Wall 92 <br /> I <br /> 36 8-01.3(2)B SEEDING AND FERTILIZING 95 <br /> 37 Bark or Wood Chip Mulch 96 <br /> 38 8-04 CURBS,GUTTERS,AND SPILLWAYS 96 <br /> 39 8-04.1 DESCRIPTION 96 I/ <br /> 40 8-04.3 CONSTRUCTION REQUIREMENTS 96 <br /> 41 8-04.3(1) Cement Concrete Curbs, Gutters, and Spillways 96 <br /> I <br /> 42 8-04.5 PAYMENT 97 <br /> 43 8-14 CEMENT CONCRETE SIDEWALKS 97 <br /> 44 8-14.3 CONSTRUCTION REQUIREMENTS 97 1 <br /> 45 8-14.3(1) Excavation 97 <br /> 46 8-14.3(6) Curb Ramp 98 <br /> 47 8-14.4 MEASUREMENT 98 <br /> 48 8-14.5 PAYMENT 98 <br /> 49 ILLUMINATION,TRAFFIC SIGNAL SYSTEMS,INTELLIGENT TRANSPORTATION SYSTEMS,AND ELECTRICAL 99 <br /> 50 MATERIALS 99 <br /> I <br /> 51 ILLUMINATION,TRAFFIC SIGNAL SYSTEMS,INTELLIGENT TRANSPORTATION SYSTEMS,AND ELECTRICAL 99 <br /> 4151 STREET TO WMVD FREIGHT I CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-2 February 17,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.