Laserfiche WebLink
I <br /> 1 <br /> 1 TABLE OF CONTENT <br /> I <br /> 2 INTRODUCTION 5 <br /> I <br /> 3 INTRODUCTION TO THE SPECIAL PROVISIONS 5 <br /> 4 DESCRIPTION OF WORK 7 <br /> I 5 BID PROCEDURES AND CONDITIONS 9 <br /> 6 1-02.2 PLANS AND SPECIFICATIONS 9 <br /> 7 EXAMINATION OF PLANS,SPECIFICATIONS AND SITE OF WORK 10 <br /> 8 Subsurface Information 10 <br /> I <br /> 9 PREPARATION OF PROPOSAL 11 <br /> 10 DELIVERY OF PROPOSAL 12 <br /> 11 1-02.9 DELIVERY OF PROPOSAL 13 <br /> I 12 1-02.10 WITHDRAWING,REVISING,OR SUPPLEMENTING PROPOSAL 13 <br /> 13 PUBLIC OPENING OF PROPOSALS 14 <br /> 14 CONTROL OF WORK 19 <br /> I <br /> 15 CONFORMITY WITH AND DEVIATIONS FROM PLANS AND STAKES 19 <br /> 16 (April 4,2011) 19 <br /> 17 ContractorSurveying-Structure 19 <br /> 18 Payment 22 <br /> I 19 (April 1, 2013) 22 <br /> 20 Contractor Surveying Roadway 22 <br /> 21 Payment 25 <br /> I 22 COOPERATION WITH OTHER CONTRACTORS 27 <br /> 23 (March 13, 1995) 28 <br /> 24 Other Contracts Or Other Work 28 <br /> I 25 CONTROL OF MATERIAL 30 <br /> 26 Buy America 30 <br /> 27 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 32 <br /> 28 LOAD LIMITS 34 <br /> I <br /> 29 WAGES 34 <br /> 30 General 35 <br /> 31 REQUIREMENTS FOR NONDISCRIMINATION 36 <br /> I <br /> 32 Disadvantaged Business Enterprise Condition of Award Participation 43 <br /> 33 FEDERAL AGENCY INSPECTION 56 <br /> 34 (January 25,2016) 57 <br /> I 35 Required Federal Aid Provisions 57 <br /> 36 UTILITIES AND SIMILAR FACILITIES 57 <br /> 37 1-07.18 PUBLIC LIABILITY AND PROPERTY DAMAGE INSURANCE 58 <br /> 38 1-07.18 INSURANCE 58 <br /> I 39 1-07.18(1) General Requirements 58 <br /> 40 1 07.18(2) Additional Insured 59 <br /> 41 1-07.18(3) Subcontractors 60 <br /> I <br /> 42 1-07.18(4) Evidence of Insurance 60 <br /> 43 1-07.18(5) Coverages and Limits 60 <br /> 44 PUBLIC CONVENIENCE AND SAFETY 62 <br /> I 45 Construction Under Traffic 62 <br /> 46 PROSECUTION AND PROGRESS 65 <br /> 47 SUBCONTRACTING 67 <br /> 48 TIME FOR COMPLETION 69 <br /> I <br /> 49 SUSPENSION OF WORK 70 <br /> I 41St STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-1 February 17,2016 <br />