My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 1 TABLE OF CONTENT <br /> I <br /> 2 INTRODUCTION 5 <br /> I <br /> 3 INTRODUCTION TO THE SPECIAL PROVISIONS 5 <br /> 4 DESCRIPTION OF WORK 7 <br /> I 5 BID PROCEDURES AND CONDITIONS 9 <br /> 6 1-02.2 PLANS AND SPECIFICATIONS 9 <br /> 7 EXAMINATION OF PLANS,SPECIFICATIONS AND SITE OF WORK 10 <br /> 8 Subsurface Information 10 <br /> I <br /> 9 PREPARATION OF PROPOSAL 11 <br /> 10 DELIVERY OF PROPOSAL 12 <br /> 11 1-02.9 DELIVERY OF PROPOSAL 13 <br /> I 12 1-02.10 WITHDRAWING,REVISING,OR SUPPLEMENTING PROPOSAL 13 <br /> 13 PUBLIC OPENING OF PROPOSALS 14 <br /> 14 CONTROL OF WORK 19 <br /> I <br /> 15 CONFORMITY WITH AND DEVIATIONS FROM PLANS AND STAKES 19 <br /> 16 (April 4,2011) 19 <br /> 17 ContractorSurveying-Structure 19 <br /> 18 Payment 22 <br /> I 19 (April 1, 2013) 22 <br /> 20 Contractor Surveying Roadway 22 <br /> 21 Payment 25 <br /> I 22 COOPERATION WITH OTHER CONTRACTORS 27 <br /> 23 (March 13, 1995) 28 <br /> 24 Other Contracts Or Other Work 28 <br /> I 25 CONTROL OF MATERIAL 30 <br /> 26 Buy America 30 <br /> 27 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 32 <br /> 28 LOAD LIMITS 34 <br /> I <br /> 29 WAGES 34 <br /> 30 General 35 <br /> 31 REQUIREMENTS FOR NONDISCRIMINATION 36 <br /> I <br /> 32 Disadvantaged Business Enterprise Condition of Award Participation 43 <br /> 33 FEDERAL AGENCY INSPECTION 56 <br /> 34 (January 25,2016) 57 <br /> I 35 Required Federal Aid Provisions 57 <br /> 36 UTILITIES AND SIMILAR FACILITIES 57 <br /> 37 1-07.18 PUBLIC LIABILITY AND PROPERTY DAMAGE INSURANCE 58 <br /> 38 1-07.18 INSURANCE 58 <br /> I 39 1-07.18(1) General Requirements 58 <br /> 40 1 07.18(2) Additional Insured 59 <br /> 41 1-07.18(3) Subcontractors 60 <br /> I <br /> 42 1-07.18(4) Evidence of Insurance 60 <br /> 43 1-07.18(5) Coverages and Limits 60 <br /> 44 PUBLIC CONVENIENCE AND SAFETY 62 <br /> I 45 Construction Under Traffic 62 <br /> 46 PROSECUTION AND PROGRESS 65 <br /> 47 SUBCONTRACTING 67 <br /> 48 TIME FOR COMPLETION 69 <br /> I <br /> 49 SUSPENSION OF WORK 70 <br /> I 41St STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-1 February 17,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.