My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 (a) Light source to pole base distance (H1) shall be as noted in the Plans. <br /> 2 Verification of H1 distances by the Engineer, prior to fabrication, is not <br /> 3 required. Fabrication tolerance shall be ❑❑6 inches. <br /> 4 <br /> 5 (b) All other requirements of the Special Provisions have been satisfied. <br /> 6 <br /> 7 Pre-Approved Plan Fabricator Mounting Hgt. <br /> 8 <br /> 9 Drawing No. DB00654 Rev. H Valmont Ind. Inc. 30', 35', 40' & 50' <br /> 10 Sheets 1, 2, 3 & 4 <br /> 11 <br /> 12 Drawing No. Ameron Pole 20',25',30',35',40', <br /> 13 W3721-1 Rev. L & Prod. Div. 45' & 50' 111 <br /> 14 W3721-2 Rev. E <br /> 15 I 16 Drawing No. NWS 3510 Rev. Northwest Signal 25', 30', 35', <br /> 17 2 or NWS 3510B Supply, Inc. 40', 45' & 50' <br /> 18 Rev. 2 <br /> 19 <br /> 20 Drawing WS-SL-01 American Pole 25', 30', 35', <br /> 21 Revision 7 Structures, Inc. 40', 45', 50' <br /> 22 Sheets 1 & 2 of 2 <br /> 23 <br /> 24 Drawing 71035-B39 Union Metal Corp 40' <br /> 25 Rev. R11 <br /> 26 Sheets 1 & 2 of 2 <br /> 27 <br /> 28 Drawing 71035-B50 Rev. R4 Union Metal Corp. 50' <br /> Il <br /> 29 Sheets 1, 2 & 3 and <br /> 30 B100-B335 Rev. R1 <br /> 31 <br /> 32 Drawing 71035-B47 Rev. R3 Union Metal Corp 40', 50' I <br /> 33 Sheet 1 of 1 <br /> 34 Elbow Mounting Detail <br /> 35 <br /> 36 Drawing No. WSDOT-LP-01 West Coast 25', 30', 35', 40', <br /> 37 Rev. 4, Sheets 1 and 2 or Engineering 45', and 50' <br /> 38 WSDOT- LP-01-BE Rev 3 Group <br /> 39 Sheets 1 and 2 or <br /> 40 WSDOT- LP-01-C8B Rev 2 <br /> 41 <br /> 42 Drawing No. 10-31-RWP-1 KW Industries 25, 30, 35, 40, 45, 50 III <br /> 43 Rev. 7 Sheets 1, 2 & 3 <br /> 44 I 45 Drawing No. 10-31-RWP-3 KW Industries <br /> 46 Rev. 2 <br /> 47 (Bridge Mount Details) <br /> 48 <br /> I <br /> 41'`STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-112 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.