Laserfiche WebLink
I <br /> I <br /> 1 2. Switches and controls. <br /> 2 3. Inputs and outputs from test panel. <br /> 3 4. Phase sequence and rotation (where applicable.) • <br /> 4 5. Timing limits. <br /> 5 6. Internal time base (where applicable). <br /> 6 7. Protected/permissive left-turn (where applicable). <br /> 7 8. Overlaps (where applicable). <br /> 8 C) Conflict Monitor <br /> 9 1. Programming. <br /> 10 2. Threshold of operation. <br /> 11 D) Modem and Telemetry <br /> 12 1. Tested with master controller. <br /> 13 <br /> 14 Acceptance of equipment will be made upon completion of testing. Testing of <br /> 15 controller, cabinet, and auxiliary signal equipment will require a minimum of 15 <br /> 16 working days from the time a complete cabinet and all Contractor supplied auxiliary 111 <br /> 17 equipment are delivered to the City. Repair or replacement of defective equipment <br /> 18 will restart the testing procedure and, although the testing may be completed in a <br /> 19 shorter time, a new 15 working day testing period shall commence. <br /> 20 <br /> 21 <br /> 22 C 8220 T OM/1g MCCi IRO 0`ERA D., ® 114ZA R -kRIc ,R <br /> 23 Traffic Signal Controller <br /> 24 Section 9-29.13(3) is supplemented with the following: <br /> 25 <br /> 26 Signal Controller <br /> 27 Type 2070 control equipment shall be Siemens 2070 ATC controllers. All <br /> 28 signal controllers will be a model listed by the software manufacturer to <br /> 29 operate Siemens SEPAC traffic signal controller software, most current <br /> 30 version. All signal controllers will also be a model listed by the software <br /> 31 manufacturer to be fully compatible with the Siemens TACTICS Central Traffic <br /> 32 Management Software. <br /> 33 <br /> 34 NEMA control equipment shall be Siemens NEMA ATC M62 controllers. All <br /> 35 signal controllers will be a model listed by the software manufacturer to <br /> 36 operate Siemens SEPAC traffic signal controller software, most current <br /> 37 version. All signal controllers will also be a model listed by the software <br /> 38 manufacturer to be fully compatible with the Siemens TACTICS Central Traffic <br /> 39 Management Software. <br /> 4 <br /> 411 <br /> 42 Traffic Signal Controller Software <br /> 43 Section 9-29.13(3) is supplemented with the following: <br /> 44 <br /> 45 Signal Controller Software <br /> 46 Siemens SEPAC control software shall be provided for each signal controller <br /> 47 on this project, most current version. All signal controller software will be fully <br /> 48 compatible with the Siemens TACTICS Central Traffic Management Software. <br /> 49 <br /> 50 <br /> 415'STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012); PW#3472 SP-128 February 10,2016 <br />