My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 The Contractor shall install the pole and bracket cable to the end of the luminaire <br /> 2 arm with thirty (30) inches of excess wire to hook up the luminaire. I 3 <br /> 4 Conventional Roadway Luminaires <br /> 5 Section 9-29.10(1) is supplemented with the following: I 6 <br /> 7 The Contractor shall choose and install a source from the following specifications: <br /> 8 <br /> I <br /> 9 Manufacturer LeotekTM <br /> 10 Series Green Cobra TM <br /> 11 Luminaire GCA1 <br /> 12 Lamp 60F or 80F LED <br /> I <br /> 13 Color Temp 4300°K <br /> 14 Optical System 3 <br /> 15 Voltage 120-277V <br /> I <br /> 16 Drive Current 530 mA <br /> 17 Finish GY (Grey) <br /> 18 <br /> I <br /> 19 or <br /> 20 <br /> 21 Manufacturer CreeTM I 22 Series LED WAYTM' <br /> 23 Luminaire LWY <br /> 24 Lamp 08E LED <br /> I <br /> 25 Color Temp 4300°K <br /> 26 Optical System 3 <br /> 27 Voltage 120-277V <br /> 28 Drive Current 525 mA <br /> I <br /> 29 Finish GY (Grey) <br /> 30 <br /> 31 or I 32 <br /> 33 Manufacturer LED <br /> 34 ROADWAY TM <br /> I <br /> 35 Series NXTTM <br /> 36 Luminaire NXT-M <br /> 37 Lamp 60M <br /> 38 Color Temp 4500°K <br /> I <br /> 39 Optical System 3LB <br /> 40 Voltage 120-277V <br /> 41 Drive Current 525 mA I 42 Finish GY (Grey) <br /> 43 <br /> 44 I 45 CIVH 8 203 i4 C`IN:DUGTIONF LOOP <br /> �. .. .�s ,�..�,_o �.. )�.,. .�.r 5'•RST <br /> 46 Induction Loop Vehicle Detectors <br /> 47 Section 8-20.3(14)C is supplemented with the following: I 48 <br /> 49 Induction loops shall be constructed as detailed in City of Everett Drawing <br /> 50 Nos. 802, 802A, 806A, 806B, and 806C, and Section 8-20.3(14)C of the I 51 Standard Specifications with the following modifications: <br /> 41st STREET TO WMVD FREIGHT I CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-146 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.