My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 communications infrastructure shown in the Plans. This lump sum item includes <br /> I <br /> 2 <br /> 3 installation of all conduits, couplings, vaults, junction boxes, trenching and backfill, <br /> directional boring and all other work necessary for the installation of the fiber optic <br /> 4 conduit system. This lump sum item also includes the installation and splicing of fiber <br /> 5 optic and communication cable shown in the plans, including splicing of trunk fiber to 12 <br /> I6 SMF cable drops at each cabinet, splicing of trunk fiber, and splice enclosures, <br /> 7 preterminated patch panels, fiber management trays, distribution panels, fiber optic <br /> 8 patch cables, testing, and all other equipment necessary for communication between <br /> I9 trunk fiber and switches in each cabinet. All costs for Ethernet switches, Ethernet <br /> 10 cables, and switch power cable at individual traffic signals shall be included in the lump <br /> 11 sum for the associated traffic signal system bid item. <br /> I 12 <br /> 13 _ <br /> 14 8; 21:GR8 <br /> 15 Permanent Signing <br /> 16 <br /> 17 070100: <br /> I18 Materials <br /> 19 <br /> 20 #:410-011:0741076101 <br /> GRB <br /> I21 Roadside Sign Structures <br /> 22 Section 9-06.16 is supplemented with the following: <br /> I 23 <br /> 24 8i22. 1OP1GR8 <br /> 25 (January 3, 2011) <br /> 26 Perforated Steel Square Sign Post System <br /> I <br /> 27 Where noted in the Plans, steel sign post systems shall be square, pre-punched <br /> 28 galvanized steel tubing, that are NCHRP 350 Test Level 3 Certified and FHWA <br /> 29 approved. The steel sign post system shall include all anchor sleeves, and other <br /> I <br /> 30 hardware required for a complete sign installation. <br /> 31 <br /> 32 System Acceptance <br /> I <br /> 33 <br /> 34 Systems listed in the current QPL will be accepted per the QPL approval code. <br /> Systems not listed in the QPL will be accepted based on a Supplier's Certificate of <br /> 35 Compliance. The Supplier's Certificate of Compliance will be a contract specific <br /> I <br /> 36 letter from the supplier stating the system is NCHRP 350 Test Level 3 compliant. <br /> 37 <br /> 38 8¢21 2 9 28 1~76076 GR8_ <br /> I <br /> 39 <br /> 40 (January 3, 2011) <br /> Manufacturers for Steel Roadside Sign Supports <br /> 41 The Standard Plans lists several steel sign support types. These supports are <br /> I <br /> 42 <br /> 43 patented devices and many are sole-source. All of the sign support types listed <br /> below are acceptable when shown in the Plans. <br /> 44 <br /> I <br /> 45 Steel Sign Support Type Manufacturer <br /> 46 Type TP-A&TP-B Transpo Industries, Inc. <br /> 47 <br /> 48 Type PL, PL-T& PL-U Northwest Pipe Co. <br /> I49 <br /> I 41st STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012); PW#3472 SP-149 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.