Laserfiche WebLink
1 <br /> 1 <br /> 2 If traffic signal loops that fail the tests, as described above, are not replaced <br /> 3 and operational within 48 hours, the Contractor shall install and maintain <br /> 4 interim video detection until the replacement loops are operational. The type <br /> 5 of interim video detection furnished shall be approved by the Engineer prior to <br /> 6 installation. <br /> 7 <br /> 8 <br /> 9 CNH 8 204M,EASU.tEMENT RTF <br /> 10 Measurement <br /> 11 The first sentence of Section 8-20.4 is revised to read: <br /> 12 <br /> 13 No specific unit of measurement will apply to the lump sum items for illumination <br /> 14 system, intelligent transportation system (ITS), or traffic signal systems, but <br /> 15 measurement will be for the sum total of all items for a complete system to be furnished <br /> 16 and installed. <br /> 17 <br /> 18 <br /> 19 CN HTB, <br /> 20 8-20.5 Payment <br /> 21 <br /> 22 Section 8-20.5 is supplemented with the following: <br /> 23 <br /> 24 All costs associated with adjusting junction boxes to grade including excavation, <br /> 25 backfill, and restoration of adjacent areas in a manner acceptable to the ENGINEER, <br /> 26 shall be included in the associated traffic signal bid item. <br /> 27 <br /> 28 If junction box adjustment involves conduit modification, as determined by the <br /> 29 ENGINEER, payment will be made in accordance with Section 1-09.6. <br /> 30 <br /> 31 All costs associated with the installation of the electrical service, illumination system, <br /> 32 and associated hardware shall be included in the associated lump sum bid item for <br /> 33 traffic signal system. <br /> 34 <br /> 35 All costs associated with installation temporary and permanent video detection systems <br /> 36 shall be included in the associated lump sum bid item for traffic signal system. <br /> 37 <br /> 38 All costs associated with ITS equipment including cameras, cables, and other hardware <br /> 39 between the controller cabinet and signals shall be included in the associated lump sum <br /> 40 bid item for traffic signal system. <br /> 41 <br /> 42 All costs associated with the removal and installation of signs on the traffic signal poles <br /> 43 shall be included in the associated lump sum bid item for permanent signing. <br /> 44 <br /> 45 Payment will be made for the following bid items that are included in the proposal: <br /> 46 <br /> 47 "Communication System 41st St, Rucker Ave, and Pacific Ave", per Lump Sum. <br /> 48 <br /> 49 The lump sum contract price for "Communication System 41st St, Rucker Ave, and <br /> 50 Pacific Ave" shall be full pay for all materials, labor, tools and equipment to install , <br /> 41st STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012); PW#3472 SP-148 February 10, 2016 <br />