My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 6) All white parking lines shall be paint line. <br /> 1 2 7) All wide line, dotted extension line, arrows, symbols, and letters shall be Type D <br /> 3 plastic flat line. <br /> 4 <br /> 5 8-22.4 Measurement <br /> 6 <br /> 7 Crosswalk line and stop line will be measured by the linear foot of 24" wide marking <br /> 8 installed. <br /> 9 <br /> U10 Crosswalk line 12" wide marking will be measured by linear foot, installed. <br /> 11 <br /> 12 8-22.5 Payment <br /> U <br /> 13 <br /> 14 Section 8-22 is supplemented read as follows: <br /> 15 <br /> I <br /> 16 <br /> 17 "4-inch Paint Line", per Linear Foot <br /> "4-inch Plastic Line", per Linear Foot <br /> 18 "8-inch Plastic Line", per Linear Foot <br /> I 19 <br /> 20 "12-inch Plastic Crosswalk Ladder Line", per Linear Foot <br /> "24-inch Plastic Crosswalk Line", per Linear Foot <br /> 21 "24-inch Plastic Stop Line", per Linear Foot <br /> 22 "Plastic Sharrow", per Each <br /> I23 "Plastic Helmeted Bicyclist", per Each <br /> 24 <br /> 25 S Q `S eltj <br /> 26 SECTION 8-30 BUS SHELTER RELOCATION <br /> 27 (New Section) <br /> I28 (******) <br /> 29 8-30.1 Description <br /> I 30 <br /> 31 This work shall consist of the relocation of bus shelter, bench, transit sign and garbage <br /> 32 bin, in accordance with these Specifications and the details shown in the Standard <br /> I 33 Plans, or established by the engineer. Workmanship and finish of the aluminum shelter <br /> 34 shall be equal to the best general practice in modern aluminum fabricating shops. <br /> 35 <br /> I 36 8-30.2 Materials <br /> 37 <br /> 38 Anodized Aluminum - Aluminum Association; 6063-T5, T6 and ASTM B221 <br /> I <br /> 39 -Acrylic _ Selected by engineer, provided by installer. <br /> 40 Concrete WSDOT 6-02 <br /> 41 Steel - ASTM A 36 <br /> I <br /> 42 Glazing _ Selected by engineer, provided by installer. <br /> 43 Paint PMS Processed Blue. <br /> 44 Welder Wire Fabric - ASTM A 185. <br /> I45 <br /> I 41'`STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012); PW#3472 SP-151 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.