Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 1 g. The Bidder fails to submit or properly complete a Subcontractor list, if <br /> I 2 applicable, as required in Section 1-02.6; <br /> 3 h. The Bidder fails to submit or properly complete a Disadvantaged Business <br /> 4 Enterprise Certification, if applicable, as required in Section 1-02.6; <br /> 5 i. The Bidder fails to submit written confirmation from each DBE firm listed on <br /> I 6 the Bidder's completed DBE Utilization Certification that they are in <br /> 7 agreement with the bidders DBE participation commitment, if applicable, as <br /> 8 required in Section 1-02.6, or if the written confirmation that is submitted fails <br /> 9 to meet the requirements of the Special Provisions; <br /> 10 j The Bidder fails to submit DBE Good Faith Effort documentation, if <br /> 11 applicable, as required in Section 1-02.6, or if the documentation that is <br /> I <br /> 12 <br /> 13 submitted fails to demonstrate that a Good Faith Effort to meet the Condition <br /> of Award was made; <br /> 14 k. The Bid Proposal does not constitute a definite and unqualified offer to meet <br /> I <br /> 15 <br /> 16 I. the material terms of the Bid invitation; or <br /> More than one proposal is submitted for the same project from a Bidder <br /> 17 under the same or different names. <br /> I 18 <br /> 19 2. A Proposal may be considered irregular and may be rejected if: <br /> 20 a. The Proposal does not include a unit price for every Bid item; <br /> 21 b. Any of the unit prices are excessively unbalanced (either above or below the <br /> I22 amount of a reasonable Bid) to the potential detriment of the Contracting <br /> 23 Agency; <br /> 24 c. Receipt of Addenda is not acknowledged; <br /> I 25 d. A member of a joint venture or partnership and the joint venture or <br /> 26 partnership submit Proposals for the same project (in such an instance, both <br /> 27 Bids may be rejected); or <br /> I <br /> 28 e. If Proposal form entries are not made in ink. <br /> 29 <br /> 30 ,jtO2 .666-6 A Ri'F <br /> I 31 1-02.14 Disqualification of Bidders <br /> 32 (March 8, 2013 APWA GSP, Option A) <br /> 33 <br /> I 34 Delete this section and replace it with the following: <br /> 35 <br /> 36 A Bidder will be deemed not responsible if the Bidder does not meet the mandatory <br /> I 37 bidder responsibility criteria in RCW 39.04.350(1), as amended. <br /> 38 <br /> 39 As evidence that the Bidder meets the mandatory bidder responsibility criteria, the <br /> 40 apparent two lowest Bidders must submit to the Contracting Agency within 24 hours of <br /> I41 the bid submittal deadline, documentation (sufficient in the sole judgment of the <br /> 42 Contracting Agency) demonstrating compliance with all responsibility criteria. The <br /> 43 Contracting Agency reserves the right to request such documentation from other Bidders <br /> 44 as well, and to request further documentation as needed to assess bidder responsibility. <br /> 45 The Contracting Agency also reserves the right to obtain information from third parties <br /> 46 concerning a Bidder's compliance with the mandatory bidder responsibility criteria. <br /> I 47 <br /> 48 If the Contracting Agency determines the Bidder does not meet the mandatory bidder <br /> 49 responsibility criteria in RCW 39.04.350(1) and is therefore not a responsible Bidder, the <br /> 111 50 Contracting Agency shall notify the Bidder in writing, with the reasons for its <br /> I 41st STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-15 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.