My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> I <br /> 1 determination. If the Bidder disagrees with this determination, it may appeal the <br /> 2 determination within two (2) business days of the Contracting Agency's determination by <br /> 3 presenting its appeal and any additional information to the Contracting Agency. The <br /> 4 Contracting Agency will consider the appeal and any additional information before <br /> 5 issuing its final determination. If the final determination affirms that the Bidder is not <br /> 6 responsible, the Contracting Agency will not execute a contract with any other Bidder <br /> 7 until at least two business days after the Bidder determined to be not responsible has <br /> 8 received the Contracting Agency's final determination. <br /> 9 <br /> 10 raliTiffitl <br /> . <br /> 11 1-02.15 Pre Award Information <br /> 12 (August 14, 2013 APWA GSP) ' <br /> 13 <br /> 14 Revise this section to read: <br /> 15 <br /> 16 Before awarding any contract, the Contracting Agency may require one or more of these <br /> 17 items or actions of the apparent lowest responsible bidder: <br /> 18 1. A complete statement of the origin, composition, and manufacture of any or all <br /> 19 materials to be used, <br /> 20 2. Samples of these materials for quality and fitness tests, <br /> 21 3. A progress schedule (in a form the Contracting Agency requires) showing the order <br /> 22 of and time required for the various phases of the work, <br /> 23 4. A breakdown of costs assigned to any bid item, <br /> 24 5. Attendance at a conference with the Engineer or representatives of the Engineer, ' <br /> 25 6. Obtain, and furnish a copy of, a business license to do business in the city or county <br /> 26 where the work is located. <br /> 27 7. Any other information or action taken that is deemed necessary to ensure that the , <br /> 28 bidder is the lowest responsible bidder. <br /> 29 <br /> 30 <br /> 31 frI OM <br /> 32 1-03.1(1) Identical Bid Totals <br /> 33 (January 4, 2016 APWA GSP) <br /> 34 <br /> 35 Revise this section to read: <br /> 36 <br /> 37 After opening Bids, if two or more lowest responsive Bid totals are exactly equal, then <br /> 38 the tie-breaker will be the Bidder with an equal lowest bid, that proposed to use the <br /> 39 highest percentage of recycled materials in the Project, per the form submitted with the 11140 Bid Proposal. If those percentages are also exactly equal, then the tie-breaker will be <br /> 41 determined by drawing as follows: Two or more slips of paper will be marked as follows: <br /> 42 one marked "Winner" and the other(s) marked "unsuccessful". The slips will be folded to <br /> 43 make the marking unseen. The slips will be placed inside a box. One authorized <br /> 44 representative of each Bidder shall draw a slip from the box. Bidders shall draw in <br /> 45 alphabetic order by the name of the firm as registered with the Washington State <br /> 46 Department of Licensing. The slips shall be unfolded and the firm with the slip marked <br /> 47 "Winner" will be determined to be the successful Bidder and eligible for Award of the <br /> 48 Contract. Only those Bidders who submitted a Bid total that is exactly equal to the lowest <br /> 41st STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012); PW#3472 SP-16 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.