My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 <br /> 1 F105 IF <br /> 2 1-05.11 Final Inspection <br /> 3 <br /> 4 Delete this section and replace it with the following: <br /> 5 <br /> 6 1-05.11 Final Inspections and Operational Testing <br /> 7 (October 1, 2005 APWA GSP) <br /> 8 <br /> 9 1-05.11(1) Substantial Completion Date <br /> 10 <br /> 11 When the Contractor considers the work to be substantially complete, the Contractor <br /> 12 shall so notify the Engineer and request the Engineer establish the Substantial I <br /> 13 Completion Date. The Contractor's request shall list the specific items of work that <br /> 14 remain to be completed in order to reach physical completion. The Engineer will <br /> 15 schedule an inspection of the work with the Contractor to determine the status of <br /> 16 completion. The Engineer may also establish the Substantial Completion Date <br /> 17 unilaterally. <br /> 18 <br /> 111 <br /> 19 If, after this inspection, the Engineer concurs with the Contractor that the work is <br /> 20 substantially complete and ready for its intended use, the Engineer, by written notice to <br /> 21 the Contractor, will set the Substantial Completion Date. If, after this inspection the <br /> 22 Engineer does not consider the work substantially complete and ready for its intended <br /> 23 use, the Engineer will, by written notice, so notify the Contractor giving the reasons <br /> 24 therefor. <br /> 25 <br /> 26 Upon receipt of written notice concurring in or denying substantial completion, whichever <br /> 27 is applicable, the Contractor shall pursue vigorously, diligently and without unauthorized <br /> 28 interruption, the work necessary to reach Substantial and Physical Completion. The <br /> 29 Contractor shall provide the Engineer with a revised schedule indicating when the <br /> 30 Contractor expects to reach substantial and physical completion of the work. <br /> 31 <br /> 32 The above process shall be repeated until the Engineer establishes the Substantial <br /> 33 Completion Date and the Contractor considers the work physically complete and ready <br /> 34 for final inspection. <br /> 35 <br /> 36 1-05.11(2) Final Inspection and Physical Completion Date <br /> 37 <br /> 38 When the Contractor considers the work physically complete and ready for final <br /> 39 inspection, the Contractor by written notice, shall request the Engineer to schedule a <br /> 40 final inspection. The Engineer will set a date for final inspection. The Engineer and the <br /> 41 Contractor will then make a final inspection and the Engineer will notify the Contractor in I <br /> 42 writing of all particulars in which the final inspection reveals the work incomplete or <br /> 43 unacceptable. The Contractor shall immediately take such corrective measures as are <br /> 44 necessary to remedy the listed deficiencies. Corrective work shall be pursued vigorously, <br /> 45 diligently, and without interruption until physical completion of the listed deficiencies. <br /> 46 This process will continue until the Engineer is satisfied the listed deficiencies have been <br /> 47 corrected. <br /> 48 <br /> 49 If action to correct the listed deficiencies is not initiated within 7 days after receipt of the <br /> 50 written notice listing the deficiencies, the Engineer may, upon written notice to the <br /> 41s`STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-26 February 10, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.