Laserfiche WebLink
1 <br /> 1 <br /> 1 F105 IF <br /> 2 1-05.11 Final Inspection <br /> 3 <br /> 4 Delete this section and replace it with the following: <br /> 5 <br /> 6 1-05.11 Final Inspections and Operational Testing <br /> 7 (October 1, 2005 APWA GSP) <br /> 8 <br /> 9 1-05.11(1) Substantial Completion Date <br /> 10 <br /> 11 When the Contractor considers the work to be substantially complete, the Contractor <br /> 12 shall so notify the Engineer and request the Engineer establish the Substantial I <br /> 13 Completion Date. The Contractor's request shall list the specific items of work that <br /> 14 remain to be completed in order to reach physical completion. The Engineer will <br /> 15 schedule an inspection of the work with the Contractor to determine the status of <br /> 16 completion. The Engineer may also establish the Substantial Completion Date <br /> 17 unilaterally. <br /> 18 <br /> 111 <br /> 19 If, after this inspection, the Engineer concurs with the Contractor that the work is <br /> 20 substantially complete and ready for its intended use, the Engineer, by written notice to <br /> 21 the Contractor, will set the Substantial Completion Date. If, after this inspection the <br /> 22 Engineer does not consider the work substantially complete and ready for its intended <br /> 23 use, the Engineer will, by written notice, so notify the Contractor giving the reasons <br /> 24 therefor. <br /> 25 <br /> 26 Upon receipt of written notice concurring in or denying substantial completion, whichever <br /> 27 is applicable, the Contractor shall pursue vigorously, diligently and without unauthorized <br /> 28 interruption, the work necessary to reach Substantial and Physical Completion. The <br /> 29 Contractor shall provide the Engineer with a revised schedule indicating when the <br /> 30 Contractor expects to reach substantial and physical completion of the work. <br /> 31 <br /> 32 The above process shall be repeated until the Engineer establishes the Substantial <br /> 33 Completion Date and the Contractor considers the work physically complete and ready <br /> 34 for final inspection. <br /> 35 <br /> 36 1-05.11(2) Final Inspection and Physical Completion Date <br /> 37 <br /> 38 When the Contractor considers the work physically complete and ready for final <br /> 39 inspection, the Contractor by written notice, shall request the Engineer to schedule a <br /> 40 final inspection. The Engineer will set a date for final inspection. The Engineer and the <br /> 41 Contractor will then make a final inspection and the Engineer will notify the Contractor in I <br /> 42 writing of all particulars in which the final inspection reveals the work incomplete or <br /> 43 unacceptable. The Contractor shall immediately take such corrective measures as are <br /> 44 necessary to remedy the listed deficiencies. Corrective work shall be pursued vigorously, <br /> 45 diligently, and without interruption until physical completion of the listed deficiencies. <br /> 46 This process will continue until the Engineer is satisfied the listed deficiencies have been <br /> 47 corrected. <br /> 48 <br /> 49 If action to correct the listed deficiencies is not initiated within 7 days after receipt of the <br /> 50 written notice listing the deficiencies, the Engineer may, upon written notice to the <br /> 41s`STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-26 February 10, 2016 <br />