My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 Payment <br /> I 2 Payment will be made in accordance with Section 1-04.1 for the following bid item when <br /> 3 included in the proposal: <br /> 4 <br /> 5 "Roadway Surveying", lump sum. <br /> 6 <br /> 7 The lump sum contract price for "Roadway Surveying" shall be full pay for all labor, <br /> 8 equipment, materials, and supervision utilized to perform the Work specified, including <br /> I 9 any resurveying, checking, correction of errors, replacement of missing or damaged <br /> 10 stakes, and coordination efforts. <br /> 11 <br /> I , ,,. <br /> 12 14051ATF <br /> 13 1-05.7 Removal of Defective and Unauthorized Work <br /> 14 (October 1, 2005 APWA GSP) <br /> I 15 <br /> 16 Supplement this section with the following: <br /> 17 <br /> 18 If the Contractor fails to remedy defective or unauthorized work within the time specified <br /> 19 in a written notice from the Engineer, or fails to perform any part of the work required by <br /> 20 the Contract Documents, the Engineer may correct and remedy such work as may be <br /> I 21 identified in the written notice, with Contracting Agency forces or by such other means <br /> 22 as the Contracting Agency may deem necessary. <br /> 23 <br /> I <br /> 24 <br /> 25 If the Contractor fails to comply with a written order to remedy what the Engineer <br /> determines to be an emergency situation, the Engineer may have the defective and <br /> 26 unauthorized work corrected immediately, have the rejected work removed and <br /> 27 replaced, or have work the Contractor refuses to perform completed by using <br /> I28 Contracting Agency or other forces. An emergency situation is any situation when, in the <br /> 29 opinion of the Engineer, a delay in its remedy could be potentially unsafe, or might cause <br /> 30 serious risk of loss or damage to the public. <br /> I 31 <br /> 32 Direct or indirect costs incurred by the Contracting Agency attributable to correcting and <br /> 33 remedying defective or unauthorized work, or work the Contractor failed or refused to <br /> I 34 perform, shall be paid by the Contractor. Payment will be deducted by the Engineer from <br /> 35 monies due, or to become due, the Contractor. Such direct and indirect costs shall <br /> 36 include in particular, but without limitation, compensation for additional professional <br /> I 37 services required, and costs for repair and replacement of work of others destroyed or <br /> 38 damaged by correction, removal, or replacement of the Contractor's unauthorized work. <br /> 39 <br /> I <br /> 40 <br /> 41 No adjustment in contract time or compensation will be allowed because of the delay in <br /> the performance of the work attributable to the exercise of the Contracting Agency's <br /> 42 rights provided by this Section. <br /> 43 <br /> I <br /> 44 The rights exercised under the provisions of this section shall not diminish the <br /> 45 Contracting Agency's right to pursue any other avenue for additional remedy or <br /> 46 damages with respect to the Contractor's failure to perform the work as required. <br /> 1 47 <br /> 48 <br /> I <br /> 41s`STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012); PW#3472 SP-25 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.