My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 into the permanent work. The certification shall be on DOT Form 350-109EF provided <br /> 2 by the Engineer, or such other form the Contractor chooses, provided it contains the <br /> 3 same information as DOT Form 350-109EF. <br /> 4 <br /> 5 vogire. TF <br /> 6 1-06.1(4) Fabrication Inspection Expense <br /> 7 (June 27, 2011 AWPA GSP) <br /> 8 <br /> 9 Delete this section in its entirety. <br /> 10 <br /> 11 li" -.`0 . ETE <br /> 12 1-06.6 Recycled Materials <br /> 13 (January 4, 2016 APWA GSP) <br /> 14 <br /> 15 Delete this section, including its subsections, and replace it with the following: <br /> 16 <br /> 17 The Contractor shall make their best effort to utilize recycled materials in the <br /> 18 construction of the project. Approval of such material use shall be as detailed elsewhere <br /> 19 in the Standard Specifications. <br /> 20 <br /> 21 Prior to Physical Completion the Contractor shall report the quantity of recycled <br /> 22 materials that were utilized in the construction of the project for each of the items listed <br /> 23 in Section 9-03.21. The report shall include hot mix asphalt, recycled concrete <br /> 24 aggregate, recycled glass, steel furnace slag and other recycled materials (e.g. <br /> 25 utilization of on-site material and aggregates from concrete returned to the supplier). <br /> 26 The Contractor's report shall be provided on DOT form 350-075 Recycled Materials <br /> 27 Reporting. <br /> 28 <br /> r r�LiR129 1Auir <br /> 30 <br /> Legal Relations and Responsibilities to the Public <br /> 31 <br /> 32 i , 1:R <br /> 33 1-07.1 Laws to be Observed <br /> 34 (October 1, 2005 APWA GSP) <br /> 35 <br /> 36 Supplement this section with the following: <br /> 37 <br /> 38 In cases of conflict between different safety regulations, the more stringent regulation <br /> 39 shall apply. <br /> 40 <br /> 41 The Washington State Department of Labor and Industries shall be the sole and <br /> 42 paramount administrative agency responsible for the administration of the provisions of <br /> 43 the Washington Industrial Safety and Health Act of 1973 (WISHA). <br /> 44 <br /> 45 The Contractor shall maintain at the project site office, or other well known place at the <br /> 46 project site, all articles necessary for providing first aid to the injured. The Contractor <br /> 47 shall establish, publish, and make known to all employees, procedures for ensuring <br /> 48 immediate removal to a hospital, or doctor's care, persons, including employees, who <br /> 49 may have been injured on the project site. Employees should not be permitted to work <br /> 41'`STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012); PW#3472 SP-32 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.