Laserfiche WebLink
I <br /> I <br /> 1 Single lane closure has no restriction. <br /> 2 Multi-lane closures are prohibited between 5am and 8pm, 7 days a week. <br /> 3 <br /> 4 Grinding, overlay, and striping are permissible between 8pm to 5am, 7 <br /> 5 days a week. <br /> 6 <br /> 7 Colby Ave <br /> 8 Single lane closure is prohibited between 2pm and 6pm, 7 days a week. <br /> 9 Multi-lane closures are prohibited between 5am and 8pm, 7 days a week. <br /> 10 <br /> 11 West Marine View Drive (at Pacific Ave) <br /> 12 Single lane closure has no restriction. <br /> 13 Multi-lane closures are prohibited between 5am and 8pm, 7 days a week. <br /> 14 <br /> 15 Oversize loads shall not be delayed for more than 5 minutes during <br /> 16 flagging hours. The Traffic Control Supervisor shall coordinate with the <br /> 17 Engineer to receive copies of oversize load permits issued by the City. <br /> 18 <br /> 19 At Pacific Ave & Grand Ave, Rucker Ave & 35th Ave, and Pacific Ave & WI <br /> 20 Marine View Drive changes to signal operation from normal operation to <br /> 21 flashing operation or control under a police officer shall not occur <br /> 22 between 5am and 8am, and 2pm to 8pm, 7 days a week. For all otherIl <br /> 23 traffic signals, changes to signal operation from normal operation to <br /> 24 flashing operation or control under a police officer shall not occur <br /> 25 between 5am and 8pm, 7 days a week. <br /> 26 <br /> 27 *** <br /> 28 If the Engineer determines the permitted closure hours adversely affect traffic, the <br /> 29 Engineer may adjust the hours accordingly. The Engineer will notify the Contractor <br /> 30 in writing of any change in the closure hours. <br /> 31 <br /> 32 No lane closures will be allowed on a holiday or holiday weekend, or after 12:00 <br /> 33 PM (noon) on a day prior to a holiday or holiday weekend. Holidays that occur on <br /> 34 Friday, Saturday, Sunday or Monday are considered a holiday weekend. <br /> 35 111 <br /> x T� �, , <br /> 36 i 0 4..fF <br /> 37 1-07.24 Rights of Way <br /> 38 (July 23, 2015 APWA GSP) <br /> 39 <br /> 40 Delete this section and replace it with the following: <br /> 41 i 42 Street Right of Way lines, limits of easements, and limits of construction permits are <br /> 43 indicated in the Plans. The Contractor's construction activities shall be confined within <br /> 44 these limits, unless arrangements for use of private property are made. <br /> 45 <br /> 46 Generally, the Contracting Agency will have obtained, prior to bid opening, all rights of <br /> 47 way and easements, both permanent and temporary, necessary for carrying out the <br /> 48 work. Exceptions to this are noted in the Bid Documents or will be brought to the <br /> 49 Contractor's attention by a duly issued Addendum. <br /> 50 <br /> 4152 STREET TO WMVD FREIGHT <br /> 111 <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-64 February 10,2016 <br />