My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 Whenever any of the work is accomplished on or through property other than public <br /> I 2 Right of Way, the Contractor shall meet and fulfill all covenants and stipulations of any <br /> 3 easement agreement obtained by the Contracting Agency from the owner of the private <br /> 4 property. Copies of the easement agreements may be included in the Contract <br /> I 5 Provisions or made available to the Contractor as soon as practical after they have been <br /> 6 obtained by the Engineer. <br /> 7 <br /> 8 Whenever easements or rights of entry have not been acquired prior to advertising, <br /> 9 these areas are so noted in the Plans. The Contractor shall not proceed with any portion <br /> 10 of the work in areas where right of way, easements or rights of entry have not been <br /> 11 acquired until the Engineer certifies to the Contractor that the right of way or easement is <br /> I 12 available or that the right of entry has been received. If the Contractor is delayed due to <br /> 13 acts of omission on the part of the Contracting Agency in obtaining easements, rights of <br /> 14 entry or right of way, the Contractor will be entitled to an extension of time. The <br /> I 15 Contractor agrees that such delay shall not be a breach of contract. <br /> 16 <br /> 17 Each property owner shall be given 48 hours notice prior to entry by the Contractor. <br /> 18 This includes entry onto easements and private property where private improvements <br /> 19 must be adjusted. <br /> 20 <br /> 21 The Contractor shall be responsible for providing, without expense or liability to the <br /> I22 Contracting Agency, any additional land and access thereto that the Contractor may <br /> 23 desire for temporary construction facilities, storage of materials, or other Contractor <br /> 24 needs. However, before using any private property, whether adjoining the work or not, <br /> 111 25 the Contractor shall file with the Engineer a written permission of the private property <br /> 26 owner, and, upon vacating the premises, a written release from the property owner of <br /> 27 each property disturbed or otherwise interfered with by reasons of construction pursued <br /> I 28 under this contract. The statement shall be signed by the private property owner, or <br /> 29 proper authority acting for the owner of the private property affected, stating that <br /> 30 permission has been granted to use the property and all necessary permits have been <br /> I 31 obtained or, in the case of a release, that the restoration of the property has been <br /> 32 satisfactorily accomplished. The statement shall include the parcel number, address, <br /> 33 and date of signature. Written releases must be filed with the Engineer before the <br /> I 34 Completion Date will be established. <br /> 35 <br /> 36 1=08 GRI <br /> I 37 Prosecution and Progress <br /> 38 <br /> 39 14080`„RTF <br /> I 40 1-08 PROSECUTION AND PROGRESS <br /> S <br /> 41 <br /> 1 42 Add the following new section: <br /> 43 <br /> 44 1-08.0 Preliminary Matters <br /> I45 (May 25, 2006 APWA GSP) <br /> 46 <br /> I <br /> I <br /> 41s`STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-65 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.