Laserfiche WebLink
I <br /> I <br /> 1 All such dollar amounts are to become a part of Contractor's total bid. However, the <br /> 2 Contracting Agency does not warrant expressly or by implication, that the actual amount <br /> 3 of work will correspond with those estimates. Payment will be made on the basis of the <br /> 4 amount of work actually authorized by Engineer. <br /> 5 <br /> 6 I <br /> i „ 09.=.9{Paymyen� s� �RT,F� <br /> 7 1-09.9 Payments <br /> 8 (March 13, 2012 APWA GSP) <br /> 9 <br /> 10 Delete the first four paragraphs and replace them with the following: <br /> 11 <br /> 12 The basis of payment will be the actual quantities of Work performed according to the <br /> 13 Contract and as specified for payment. <br /> 14 <br /> 15 The Contractor shall submit a breakdown of the cost of lump sum bid items at the <br /> 16 Preconstruction Conference, to enable the Project Engineer to determine the Work <br /> 17 performed on a monthly basis. A breakdown is not required for lump sum items that <br /> 18 include a basis for incremental payments as part of the respective Specification. Absent <br /> 19 a lump sum breakdown, the Project Engineer will make a determination based on <br /> 20 information available. The Project Engineer's determination of the cost of work shall be <br /> 21 final. <br /> 22 <br /> 23 Progress payments for completed work and material on hand will be based upon <br /> 24 progress estimates prepared by the Engineer. A progress estimate cutoff date will be <br /> 25 established at the preconstruction conference. <br /> 26 <br /> 27 The initial progress estimate will be made not later than 30 days after the Contractor <br /> 28 commences the work, and successive progress estimates will be made every month <br /> 29 thereafter until the Completion Date. Progress estimates made during progress of the <br /> 30 work are tentative, and made only for the purpose of determining progress payments. <br /> 31 The progress estimates are subject to change at any time prior to the calculation of the <br /> 32 final payment. I 33 <br /> 34 The value of the progress estimate will be the sum of the following: <br /> 35 1. Unit Price Items in the Bid Form —the approximate quantity of acceptable units of <br /> 36 work completed multiplied by the unit price. <br /> 37 2. Lump Sum Items in the Bid Form — based on the approved Contractor's lump sum <br /> 38 breakdown for that item, or absent such a breakdown, based on the Engineer's <br /> 39 determination. <br /> 40 3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job site <br /> 41 or other storage area approved by the Engineer. <br /> 42 4. Change Orders —entitlement for approved extra cost or completed extra work as <br /> 43 determined by the Engineer. <br /> 44 <br /> 45 Progress payments will be made in accordance with the progress estimate less: <br /> 46 1. Retainage per Section 1-09.9(1), on non FHWA-funded projects; <br /> 47 2. The amount of progress payments previously made; and I <br /> 41'`STREET TO WMVD FREIGHT I CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012); PW#3472 SP-72 February 10,2016 <br />