I <br /> I <br /> 1 COMMUNICATION SYSTEM: RUCKER AVE TO W: MARINE VIEW DR. <br /> I 2 <br /> 3 <br /> 4 Charging of contract time will resume upon the Contractors' receipt of a WSDOT mix <br /> I 5 design evaluation report or delivery of the critical materials to the Contractor, notification <br /> 6 that the critical materials are ready for delivery to the Contractor from the Contracting <br /> 7 Agency's Materials Laboratory, or *** 42 *** calendar days after execution by the <br /> 8 Contracting Agency, whichever occurs first. <br /> I9 <br /> 10 No additional Procurement Suspension will be provided if the Contractors HMA mix <br /> 11 designs did not meet contract requirements and are resubmitted. <br /> I 12 _ _ <br /> 13 X10 :9pTP <br /> 14 1-08.9 Liquidated Damages <br /> I 15 (August 14, 2013 APWA GSP) <br /> 16 <br /> 17 Revise the fourth paragraph to read: <br /> I 18 <br /> 19 When the Contract Work has progressed to Substantial Completion as defined in the <br /> 20 Contract, the Engineer may determine that the work is Substantially Complete. The <br /> I 21 Engineer will notify the Contractor in writing of the Substantial Completion Date. For <br /> 22 overruns in Contract time occurring after the date so established, the formula for <br /> 23 liquidated damages shown above will not apply. For overruns in Contract time occurring <br /> I 24 after the Substantial Completion Date, liquidated damages shall be assessed on the <br /> 25 basis of direct engineering and related costs assignable to the project until the actual <br /> 26 Physical Completion Date of all the Contract Work. The Contractor shall complete the <br /> 27 remaining Work as promptly as possible. Upon request by the Project Engineer, the <br /> I28 Contractor shall furnish a written schedule for completing the physical Work on the <br /> 29 Contract. <br /> 30 <br /> I 31 1 ,09.2 a O 0324T6 <br /> 32 1-09.2(1) General Requirements for Weighing Equipment <br /> 33 (July 23, 2015 APWA GSP, Option 2) <br /> I 34 <br /> 35 Revise item 4 of the fifth paragraph to read: <br /> 36 <br /> I 37 4. Test results and scale weight records for each day's hauling operations are provided <br /> 38 to the Engineer daily. Reporting shall utilize WSDOT form 422-027, Scaleman's <br /> 39 Daily Report, unless the printed ticket contains the same information that is on the <br /> I 40 Scaleman's Daily Report Form. The scale operator must provide AM and/or PM tare <br /> 41 weights for each truck on the printed ticket. <br /> 42 <br /> Ir. <br /> 43 1.1,11 t;44 1-09.6 Force Account <br /> 45 (October 10, 2008 APWA GSP) <br /> I 46 <br /> 47 Supplement this section with the following: <br /> 48 <br /> I 49 The Contracting Agency has estimated and included in the Proposal, dollar amounts for <br /> 50 all items to be paid per force account, only to provide a common proposal for Bidders. <br /> I 41s`STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-71 February 10,2016 <br />