My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 DIVISION2GR2 <br /> I 2 Division 2 <br /> 3 Earthwork <br /> 4 <br /> 5 2. 02'3 G l <br /> 6 Construction Requirements <br /> 7 <br /> I 8 Zig 4; II ST .GR2� <br /> 9 Section 2-02.3 is supplemented with the following: <br /> 10 <br /> I 11 "2 O mitt- ii t ations.docx <br /> 12 (February 17, 1998) <br /> 13 Removal of Obstructions <br /> 111 14 *** <br /> Sheet SP1 3 existing CBs <br /> Approx. 100 LF of existing drainage pipe <br /> I Sheet SP2 7 existing CBs <br /> Approx. 160 LF of existing drainage pipe <br /> I <br /> I 15 <br /> 16 <br /> 17 *** <br /> I 18 <br /> 19 F a0 3 OPTS H-- RDO, MATERIAL:DOCX <br /> 20 (August 1, 2005) .. <br /> 21 Removal and Disposal of Hazardous Material <br /> 22 Hazardous material is suspected to exist on this project. Approximate limits of <br /> 23 contamination are identified in the Plans. The site history, prior studies and/or test <br /> I 24 <br /> 25 results LUindicate a potential for encountering Pef,roleumffe'ced. <br /> at 'soils . and/or <br /> 26 <br /> I 27 Copies of the environmental reports are available for review at the Engineer's office. All <br /> 28 necessary permits for this work will be furnished by the Contracting Agency. The <br /> 29 Contractor is responsible for all work, records, and reports required to perform the work <br /> I 30 described in this section. The Contracting Agency will perform all testing of suspected <br /> 31 hazardous or contaminated material. <br /> 32 <br /> 33 The Contractor shall notify the Engineer 10 working days prior to beginning work in the <br /> I34 area identified in the Plans as contaminated. The Contractor shall notify the Engineer <br /> 35 immediately if contamination is discovered in areas other than those identified in the <br /> 36 Plans, or is suspected through observations such as an oily sheen or discolored soils <br /> 1 <br /> 37 that may or may not emit strong chemical odors. <br /> 38 <br /> I <br /> I 41st STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-77 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.