My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 disposing of hazardous or contaminated materials at an approved facility will be paid by <br /> I 2 force account under the item "Hazardous Material Handling And Disposal". <br /> 3 <br /> 4 To provide a common basis for all bidders, the Contracting Agency has entered an <br /> I <br /> 5 amount in the proposal to become a part of the Contractor's total bid. <br /> 6 <br /> 7 "Hazardous Material Excavation Incl. Haul", per cubic yard. <br /> 8 The unit contract price for "Hazardous Material Excavation Incl. Haul" shall be full pay <br /> I9 for all costs associated with excavating the material designated to be removed, hauling <br /> 10 it to the stockpile location, and stockpiling the excavated material. <br /> 11 <br /> , eOwcu�b_12 G.KK+2 d tm RTF <br /> 13 2-02.5 Payment <br /> 14 <br /> 15 Section 2-02.5 is supplemented with the following: <br /> 16 <br /> I 17 (******) <br /> 18 <br /> 19 "Sawcut", per linear foot. <br /> I 20 <br /> 21 Saw-cutting shall be performed in accordance with Sections 2-02.3(3). <br /> 22 <br /> I 23 Measurement for saw-cutting will be per linear foot along the true length of the surface <br /> 24 cut. <br /> 25 <br /> I 26 The unit price per linear foot for the final saw-cutting of asphalt pavement, up to 8.5- <br /> 27 inch thickness, shall be full pay for all labor, materials, tools, and equipment necessary <br /> 28 to satisfactorily complete the Work as specified in Section 2-02.3(3) of the Standard <br /> 29 Specifications and disposal of cuttings slurry, including vacuum collection. <br /> I30 <br /> 31 All labor, materials, tools and equipment necessary to disposal of cuttings slurry, <br /> 32 including vacuum collection, shall be included in the Contract Unit Price. <br /> 1 33 <br /> 34 <br /> 35 2=03.GR2 <br /> 36 Roadway Excavation and Embankment <br /> 37 <br /> 38 203 4 OPT2 GR2 <br /> I39 (March 13, 1995) <br /> 40 Only one determination of the original ground elevation will be made on this project. <br /> 41 Measurement for roadway excavation and embankment will be based on the original <br /> 42 ground elevations recorded previous to the award of this contract. <br /> 43 <br /> 44 If discrepancies are discovered in the ground elevations which will materially affect the <br /> I 45 quantities of earthwork, the original computations of earthwork quantities will be <br /> 46 adjusted accordingly. <br /> 47 <br /> i <br /> I 41'`STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012); PW#3472 SP-79 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.