My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 (******) <br /> 2 It is expected there will be sufficient suitable native material excavated from various <br /> 3 portions of the improvement to fill low areas in the sidewalk subgrade and planting <br /> 4 strip area when needed and no further payment will be allowed for fill material. <br /> 5 Where there is insufficient suitable native material on the project site, the <br /> 6 Contractor shall furnish, place and compact CSTC meeting the requirements of <br /> 7 Section 4-04 of these Specifications. <br /> 8 <br /> 9 <br /> 10 8-14.3(6)Curb Ramp <br /> 11 <br /> 12 Section 8-14.3 (6) is new and is supplemented with the following: <br /> 13 (******) I <br /> 14 Curb ramp locations will be designated on the drawings or marked in the field by <br /> 15 the Engineer. Where curb ramps are to be constructed, the Contractor shall <br /> 16 construct curb ramp in accordance to the City of Everett Standard Drawing #310A, <br /> 17 310B, 310C, 310D, and 311, or WSDOT Standard Drawings F-40.12-02, F-40.14- <br /> 18 02, F-40.15-02, F-40.16-02, F-45.10-01. <br /> 19 <br /> 20 Curb ramps shall be constructed separately from the sidewalk to produce a definite <br /> 21 break line between the ramp and the sidewalk. A 3/8 inch non-extruded through <br /> 22 joint material shall be installed between the curb and the sidewalk with edging as <br /> 23 specified in Section 8-14.3(3). <br /> 24 <br /> 25 8-14.4 Measurement <br /> 26 <br /> 27 Section 8-14.4 is supplemented with the following: <br /> 28 <br /> 29 (******) <br /> 30 <br /> 31 "Modified Type Curb Ramp" per Each. <br /> 32 "Modified Half Flare Type Curb Ramp", per Each. <br /> 33 "Median Cut-Through", per Each. <br /> 34 "Type _Curb Ramp", per Each. <br /> 35 Bid Items listed above does not include the adjacent Curb, Curb and Gutter, Pedestrian <br /> 36 Curb or Sidewalks. <br /> 37 <br /> 38 <br /> 39 8-14.5 Payment <br /> 40 <br /> 41 Section 8-14.5 is supplemented with the following: <br /> 42 <br /> 43 (******) I <br /> 44 <br /> 45 "Modified Type Curb Ramp", per Each. <br /> 41"`STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-98 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.