My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 "Modified Half Flare Type Curb Ramp", per Each. <br /> 2 "Median Cut-Through", per Each. <br /> 3 "Type Curb Ramp", per Each. <br /> 4 <br /> 5 Above Bid Items do not include the adjacent Curb, Curb and Gutter, Pedestrian Curb or <br /> 6 Sidewalks. <br /> 7 <br /> 8 The placement of the CSTC under the new Cement Conc. Sidewalk shall be measured <br /> 9 and paid in accordance to Section 4-04. <br /> 10 <br /> 11 8'ti20:GR8 <br /> 12 Illumination, Traffic Signal Systems, Intelligent Transportation Systems, and <br /> 13 Electrical <br /> 14 <br /> 15 KOWEi <br /> 16 Materials <br /> 1 17 <br /> 18 8 20:GR8 <br /> 19 Illumination, Traffic Signal Systems, Intelligent Transportation Systems, and <br /> 20 Electrical <br /> 21 <br /> 22 820 "2GR8 <br /> 23 Materials <br /> 24 <br /> 25 01*7.0,1CiiiiWt410. <br /> 26 Section 8-20.2 is supplemented with the following: <br /> 27 <br /> 28 Of�a2 , c311 .CWD-i T F m-rn <br /> 29 Conduit, Innerduct, and Outerduct <br /> 30 Section 9-29.1 is supplemented with the following: <br /> 31 <br /> 32 Pull String <br /> 33 All conduit shown in the plans, proposed and existing conduit to receive <br /> 34 conductors, and conduit installed for future use, shall have flat woven polyester <br /> 35 tape installed and secured at either end of the run. Tape shall be I/" minimum <br /> 36 width and printed with sequential footage markings. Pull strength shall be 900lbs <br /> 37 minimum. <br /> ' 38 <br /> 39 Conduit Sealing <br /> 40 Mechanical plugs for cabinet conduit sealing shall be one of the following: <br /> 41 <br /> 42 1. Tyco Electronics -TDUX <br /> 43 2. Jackmoon—Triplex Duct Plugs <br /> 44 3. O-Z Gedney— Conduit Sealing Bushings <br /> 45 <br /> 46 The mechanical plug shall withstand a minimum of 5 psi of pressure. <br /> 47 <br /> r <br /> 41s`STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012); PW#3472 SP-99 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.