Laserfiche WebLink
I <br /> 1 <br /> I 2 b. The Bidder adds provisions reserving the right to reject or accept the Award, or <br /> 3 enter into the Contract; <br /> 4 <br /> I5 c. A price per unit cannot be determined from the Bid Proposal; <br /> 6 <br /> 7 d. The Proposal form is not properly executed; <br /> 8 <br /> I 9 e. The Bidder fails to submit or properly complete a Subcontractor list, if <br /> 10 applicable, as required in Section 1-02.6; <br /> 11 <br /> I 12 f. The Bidder fails to submit or properly complete a Disadvantaged Business <br /> 13 Enterprise Utilization Certification, if applicable, as required in Section 1-02.6; <br /> 14 <br /> I 15 g. The Bidder fails to submit written confirmation from each DBE firm listed on the <br /> 16 Bidder's completed Disadvantaged Business Enterprise Utilization Certification <br /> 17 that they are in agreement with the Bidder's DBE participation commitment, if <br /> I 18 applicable, as required in Section 1-02.6, or if the written confirmation that is <br /> 19 submitted fails to meet the requirements of the Special Provisions; <br /> 20 <br /> 21 h. The Bidder fails to submit Disadvantaged Business Enterprise Good Faith <br /> I 22 Effort documentation, if applicable, as required in Section 1-02.6, or if the <br /> 23 documentation that is submitted fails to demonstrate that a Good Faith Effort to <br /> 24 meet the Condition of Award was made; or <br /> I 25 <br /> 26 i. The Bid Proposal does not constitute a definite and unqualified offer to meet <br /> 27 the material terms of the Bid invitation. <br /> I 28 <br /> 29 2. A Proposal may be considered irregular and may be rejected if: <br /> 30 <br /> I 31 a. The Proposal does not include a unit price for every Bid item; <br /> 32 <br /> 33 b. Any of the unit prices are excessively unbalanced (either above or below the <br /> I 34 amount of a reasonable Bid) to the potential detriment of the Contracting <br /> 35 Agency; <br /> 36 <br /> 37 c. The authorized Proposal Form furnished by the Contracting Agency is not <br /> 1 38 used or is altered; <br /> 39 <br /> 40 d. The completed Proposal form contains any unauthorized additions, deletions, <br /> I 41 alternate Bids, or conditions; <br /> 42 <br /> 43 e. Receipt of Addenda is not acknowledged; <br /> I 44 <br /> 45 f. A member of a joint venture or partnership and the joint venture or partnership <br /> 46 submit Proposals for the same project (in such an instance, both Bids may be <br /> I 47 rejected); or <br /> 48 <br /> 49 g. If Proposal form entries are not made in ink. <br /> 1 50 <br /> I <br /> I AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />