My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1-03.AP1 <br /> 2 Section 1-03, Award and Execution of Contract I <br /> 3 January 5, 2015 <br /> 4 1-03.3 Execution of Contract <br /> 5 The first paragraph is revised to read: <br /> 6 <br /> 7 Within 20 calendar days after the Award date, the successful Bidder shall return the <br /> 8 signed Contracting Agency-prepared Contract, an insurance certification as required by <br /> 9 Section 1-07.18, and a satisfactory bond as required by law and Section 1-03.4, and <br /> 10 shall be registered as a contractor in the state of Washington. <br /> 11 <br /> 12 1-03.4 Contract Bond <br /> 13 The last word of item 3 is deleted. <br /> 14 <br /> 15 Item 4 is renumbered to 5. <br /> 16 <br /> 17 The following is inserted after item 3 (after the preceding Amendments are applied): <br /> 18 <br /> 19 4. Be conditioned upon the payment of taxes, increases, and penalties incurred on the <br /> 20 project under titles 50, 51, and 82 ROW; and <br /> 21 <br /> 22 1-03.5 Failure to Execute Contract <br /> 23 The first sentence is revised to read: <br /> 24 <br /> 25 Failure to return the insurance certification and bond with the signed Contract as <br /> 26 required in Section 1-03.3, or failure to provide Disadvantaged, Minority or Women's <br /> 27 Business Enterprise information if required in the Contract, or failure or refusal to sign <br /> 28 the Contract, or failure to register as a contractor in the state of Washington shall result <br /> 29 in forfeiture of the proposal bond or deposit of this Bidder. <br /> 30 <br /> 31 1-04.AP1 <br /> 32 Section 1-04, Scope of the Work 1 <br /> 33 August 3, 2015 <br /> 34 1-04.3 Vacant I <br /> 35 This section, including title, is revised to read: <br /> 36 <br /> 37 1-04.3 Reference Information <br /> 38 Reference Information provided to the Contractor is not part of the Contract. The <br /> 39 Contracting Agency does not guarantee the accuracy of the Reference Information and <br /> 40 is not responsible for the content of the Reference Information in any manner. Any use <br /> 41 of Reference Information by the Contractor is done solely at the Contractor's risk. <br /> 42 <br /> 43 1-04.4 Changes <br /> 44 In the third paragraph, item number 1 and 2 are revised to read: <br /> 45 <br /> 46 A. When the character of the Work as altered differs materially in kind or nature from <br /> 47 that involved or included in the original proposed construction; or <br /> I <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.