Laserfiche WebLink
1 <br /> 2 In item number 4 of the fifth paragraph, the phrase "as approved by the Engineer" is deleted. <br /> 3 <br /> 4 The last paragraph is deleted. <br /> 5 <br /> 6 6-13.3(8) Guardrail Placement <br /> 7 In the first sentence of the second paragraph, "approval" is revised to read "permission". <br /> 8 <br /> 9 6-13.3(9) SEW Traffic Barrier and SEW Pedestrian Barrier <br /> 10 The first paragraph (up until the colon) is revised to read: <br /> 11 <br /> 12 The Contractor, in conjunction with the structural earth wall manufacturer, shall design <br /> 13 and detail the SEW traffic barrier and SEW pedestrian barrier in accordance with <br /> 14 Section 6-12.3(2) and the above ground geometry details shown in the Plans. The <br /> 15 barrier Working Drawings and supporting calculations shall be Type 2E and shall <br /> 16 include, at a minimum, the following: <br /> 17 <br /> 18 6-14.AP6 I <br /> 19 Section 6-14, Geosynthetic Retaining Walls <br /> 20 January 5, 2015 <br /> 21 6-14.2 Materials <br /> 22 In the first paragraph, the section number next to "Anchor rods and associated nuts, washers <br /> 23 and couplers" is revised to read: <br /> 24 <br /> 25 9-06.5(4) <br /> 26 <br /> 27 The following new paragraph is inserted after the first paragraph: <br /> 28 <br /> 29 Anchor plate shall conform to ASTM A 36, ASTM A 572 Grade 50, or ASTM A 588. <br /> 30 <br /> 31 6-14.3(2) Submittals <br /> 32 The first paragraph (up until the colon) is revised to read: <br /> 33 <br /> 34 The Contractor shall submit Type 2 Working Drawings consisting of detailed plans for <br /> 35 each wall. As a minimum, the submittals shall include the following: <br /> 36 <br /> 37 6-14.3(4) Erection and Backfill <br /> 38 In the second sentence of the second paragraph, "approved by" is revised to read <br /> 39 "acceptable to". <br /> 40 <br /> 41 In the last sentence of the fifth paragraph, "approval" is revised to read "permission". 11142 <br /> 43 The sixth paragraph is deleted. <br /> 44 <br /> 45 In item number 5 in the eighth paragraph, the phrase "as approved by the Engineer" is <br /> 46 deleted. <br /> 47 <br /> 48 In the ninth paragraph, the first sentence is revised to read: <br /> 49 <br /> 1 <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />