My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 The Contractor shall submit Type 2E Working Drawings consisting of the soldier pile <br /> t 2 <br /> 3 wall lagging design details and supporting design calculations. The submittal shall <br /> include, at a minimum, the following: <br /> 4 <br /> ' 5 In item number 4 of the second paragraph, "approved by" is revised to read "acceptable to". <br /> 6 <br /> 7 The last paragraph (excluding the table) is revised to read: <br /> 8 <br /> 9 Notwithstanding the requirements of Section 1-06.1, steel materials used by the <br /> 10 Contractor as temporary lagging may be salvaged steel provided that the use of such <br /> 11 salvaged steel materials shall be subject to visual inspection and acceptance by the <br /> ' 12 <br /> 13 Engineer. For salvaged steel materials where the grade of steel cannot be positively <br /> identified, the design stresses for the steel shall conform to the Section 6-02.3(17)B <br /> 14 requirements for salvaged steel, regardless of whether rivets are present or not. <br /> 1 15 <br /> 16 6-16.3(6)D Installing Lagging and Permanent Ground Anchor <br /> 17 In the last sentence of the second paragraph, the phrase "as approved by the Engineer" is <br /> 18 deleted. <br /> 19 <br /> 20 In the last sentence of the fourth paragraph, the phrase "as approved by the Engineer" is <br /> ' 21 deleted. <br /> 22 <br /> 23 6-16.3(8) Concrete Fascia Panel <br /> ' 24 In the first paragraph, the phrase "as approved by the Engineer" is deleted. <br /> 25 <br /> 26 <br /> 27 6-17.AP6 <br /> ' 28 Section 6-17, Permanent Ground Anchors <br /> 29 August 3, 2015 <br /> ' 30 6-17.3(3) Submittals <br /> 31 The first paragraph is revised to read: <br /> ' 32 <br /> 33 The Contractor shall submit Type 2E Working Drawings consisting of details and <br /> 34 structural design calculations for the ground anchor system or systems intended for use. <br /> ' 35 <br /> 36 The second paragraph is revised to read: <br /> 37 <br /> ' 38 <br /> 39 The Contractor shall submit a Type 1 Working Drawing consisting of a detailed <br /> description of the construction procedure proposed for use. <br /> 40 <br /> 41 The third paragraph (up until the colon) is revised to read: <br /> 42 <br /> 43 The Contractor shall submit a Type 2 Working Drawing consisting of ground anchor <br /> 44 schedule giving: <br /> ' 45 <br /> 46 In the fourth paragraph, the first sentence is revised to read: <br /> 47 <br /> ' 48 <br /> 49 The Contractor shall submit a Type 2 Working Drawing detailing the ground anchor <br /> tendon and the corrosion protection system. <br /> 50 <br /> ' AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.