My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 6-18.AP6 <br /> ' 2 Section 6-18, Shotcrete Facing <br /> 3 January 5, 2015 <br /> 4 6-18.3(1) Submittals <br /> 5 In the first paragraph, the first sentence (up until the colon) is revised to read: <br /> 6 <br /> 7 The Contractor shall submit Type 2 Working Drawings consisting of the following: <br /> 8 <br /> 9 In the first paragraph, item number 2 is revised to read: <br /> 1 10 <br /> 11 2. Method and equipment used to apply, finish and cure the shotcrete facing. <br /> 12 <br /> 13 The last paragraph is deleted. <br /> 14 <br /> 15 6-18.3(2) Mix Design <br /> 16 In the first paragraph, the second and third sentences are deleted. <br /> 17 <br /> 18 In the last sentence of the second paragraph, "and approved by the Engineer" is deleted. <br /> I 19 <br /> 20 6-18.3(3)A Preproduction Testing <br /> 21 In the last sentence, "approved" is revised to read "accepted". <br /> I 22 <br /> 23 6-18.3(7) Shotcrete Application <br /> 24 In the last paragraph, the first sentence is revised to read: <br /> 25 <br /> 26 If field inspection or testing, by the Engineer, indicates that any shotcrete produced, fails <br /> 27 to meet the requirements, the Contractor shall immediately modify procedures, <br /> 28 equipment, or system, as necessary to produce specification material. <br /> 29 <br /> 30 6-19.AP6 <br /> 1 31 Section 6-19, Shafts <br /> 32 August 3, 2015 <br /> 33 6-19.3(2) Shaft Construction Submittal <br /> 34 The last sentence is revised to read: <br /> 35 <br /> 36 The submittals shall be Type 2 Working Drawings, except the shaft slurry technical <br /> 37 assistance submittal shall be Type 1. <br /> 38 <br /> 39 6-19.3(3) Shaft Excavation <br /> 40 In the first paragraph, the phrase "as approved by the Engineer" is deleted. <br /> 41 <br /> 42 6-19.3(3)B4 Temporary Telescoping Shaft Casing <br /> 43 In the first paragraph, the first sentence of item number 1 is revised to read: <br /> 44 <br /> 45 The Contractor shall submit the request to use temporary telescoping casing as a Type <br /> 46 2 Working Drawing. <br /> 47 <br /> I <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.