Laserfiche WebLink
I <br /> 1 6-19.3(3)D Bottom of Shaft Excavation <br /> 2 In the first sentence of the second paragraph, "approved" is revised to read "accepted". <br /> 3 <br /> 4 6-19.3(3)E Shaft Obstruction <br /> 5 In the last sentence, "approved" is revised to read "accepted". <br /> 6 <br /> 7 6-19.3(3)F Voids Between Permanent Casing and Shaft Excavation <br /> 8 In the last sentence, the words "and as approved by the Engineer" are deleted. <br /> 9 <br /> 10 6-19.3(3)G Operating Shaft Excavation Equipment From an Existing Bridge <br /> 11 The second sentence is revised to read: <br /> 12 <br /> 13 If necessary and safe to do so, and if the Contractor submits a Type 2 Working Drawing <br /> 14 consisting of a written request in accordance with Section 6-01.6, the Engineer may <br /> 15 permit operation of drilling equipment on a bridge. <br /> 16 <br /> 17 6-19.3(3)H Seals for Shaft Excavation in Water <br /> 18 The first paragraph is revised to read: <br /> 19 <br /> 20 When shafts are constructed in water and the Plans show a seal between the casing <br /> 21 shoring and the upper portion of the permanent casing of the shaft, the Contractor shall <br /> 22 construct a seal in accordance with the shaft installation narrative specified in Section 6- <br /> 23 19.3(2)B Item 7. <br /> 24 <br /> 25 The last sentence of the last paragraph is revised to read: <br /> 26 <br /> 27 If the Contractor uses a casing shoring diameter other than that specified in the Plans, <br /> 28 the Contractor shall submit a revised seal design in accordance with Section 6-19.3(2)B <br /> 29 Item 7. <br /> 30 <br /> 31 6-19.3(4)C Slurry Sampling and Testing I <br /> 32 The second to last sentence of the first paragraph is revised to read: <br /> 33 <br /> 34 Synthetic slurry shall conform to Section 9-36.2(2), the quality control plan included in <br /> 35 the shaft installation narrative in accordance with Section 6-19.3(2)B Item 4. <br /> 36 <br /> 37 The second sentence of the second paragraph is revised to read: <br /> 38 <br /> 39 These records shall be submitted as a Type 1 Working Drawing once the slurry system <br /> 40 has been established in the first drilled shaft on the project. <br /> 41 <br /> 42 6-19.3(4)E Maintenance of a Stable Shaft Excavation <br /> 43 In the last sentence of the first paragraph, "approval" is revised to read "review". <br /> 44 <br /> 45 6-19.3(4)F Disposal of Slurry and Slurry Contacted Spoils <br /> 46 This section is revised to read: <br /> 47 <br /> 48 The Contractor shall manage and dispose of the slurry wastewater in accordance with <br /> 49 Section 8-01.3(1)C. Slurry-contacted spoils shall be disposed of as specified in the <br /> 50 shaft installation narrative in accordance with Section 6-19.3(2)B, item 8, and in <br /> 51 accordance with the following requirements: <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />