My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> I <br /> 2 <br /> 3 1. Uncontaminated spoils in contact with water-only slurry may be disposed of as <br /> clean fill. <br /> 4 <br /> I 5 2. Uncontaminated spoils in contact with water slurry mixed with flocculants <br /> 6 approved in Section 8-01.3(1)C3 may be disposed of as clean fill away from <br /> 7 areas that drain to surface waters of the state. <br /> 8 <br /> 9 3. Spoils in contact with synthetic slurry or water slurry with polymer-based <br /> 10 additives or flocculants not approved in Section 8-01.3(1)C3 shall be disposed <br /> 11 of in accordance with Section 2-03.3(7)C. With permission of the Engineer, the <br /> I 12 Contractor may re-use these spoils on-site. <br /> 13 <br /> 14 4. Spoils in contact with mineral slurry shall be disposed of in accordance with <br /> I 15 Section 2-03.3(7)C. With permission of the Engineer, the Contractor may re-use <br /> 16 these spoils on-site. <br /> 17 <br /> I 18 6-19.3(5)A Steel Reinforcing Bar Cage Assembly <br /> 19 In the second to last sentence of the first paragraph, the phrase "as approved by the <br /> 20 Engineer" is deleted. <br /> 21 <br /> I22 6-19.3(5)D Steel Reinforcing Bar Cage Support at Base of Shaft Excavation <br /> 23 The first sentence is revised to read: <br /> 24 <br /> I25 For shafts with temporary casing within 15-feet of the bottom of shaft elevation as <br /> 26 specified in the Plans, the Contractor may place quarry spalls or other rock backfill <br /> 27 acceptable to the Engineer into the shaft below the specified bottom of shaft elevation <br /> I 28 as a means to support the steel reinforcing bar cage, provided that the materials and <br /> 29 means to accomplish this have been addressed by the shaft installation narrative, as <br /> 30 specified in Section 6-19.3(2)B Item 9. <br /> II 31 <br /> 32 6-19.3(6)C Care for CSL Access Tubes From Erection Through CSL Testing <br /> 33 In the last sentence, "as approved by the Engineer" is revised to read "acceptable to the <br /> I 34 Engineer". <br /> 35 <br /> 36 6-19.3(8)C Requirements for Leaving Temporary Casing in Place <br /> I 37 Item number 1 (up until the colon) is revised to read: <br /> 38 <br /> 39 1. The Contractor shall submit a Type 2E Working Drawing of the following <br /> I 40 <br /> 41 information: <br /> 42 In item C of item number 1, the phrase "in accordance with Section 6-01.9" is deleted. <br /> 43 <br /> I 44 Item number 2 is deleted. <br /> 45 <br /> 46 6-19.3(9)D Requirements to Continue Shaft Excavation Prior to Acceptance of <br /> I 47 First Shaft <br /> 48 This section is revised to read: <br /> 49 <br /> 50 Except as otherwise noted, the Contractor shall not commence subsequent shaft <br /> 51 excavations until receiving the Engineer's acceptance of the first shaft, based on the <br /> 52 results and analysis of the crosshole sonic log testing for the first shaft. The Contractor <br /> I <br /> I AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.