Laserfiche WebLink
1 8-18.AP8 <br /> 2 Section 8-18, Mailbox Support ' <br /> 3 August 4, 2014 <br /> 4 8-18.3(1) Type 3 Mailbox Support I <br /> 5 In the third paragraph, the first sentence is revised to read: <br /> 6 <br /> 7 With the Engineer's consent, a Type 3 Mailbox Support design, made of steel or other <br /> 8 durable material, that meets the NCHRP 350 or the Manual for Assessing Safety <br /> 9 Hardware (MASH) crash test criteria may be used in place of the design shown in the <br /> 10 Standard Plans. <br /> 11 <br /> 12 8-20.AP8 <br /> 13 Section 8-20, Illumination, Traffic Signal Systems, Intelligent Transportation I <br /> 14 Systems, and Electrical <br /> 15 August 3, 2015 I <br /> 16 8-20.2(1) Equipment List and Drawings <br /> 17 The second sentence of the second paragraph is revised to read: <br /> 18 111 <br /> 19 Supplemental data would include such items as catalog cuts, product Specifications, <br /> 20 shop drawings, wiring diagrams, etc. <br /> 21 <br /> 22 The third paragraph (up until the colon) is revised to read: <br /> 23 <br /> 24 If the luminaires are not listed in the Qualified Products List, the Contractor shall submit <br /> 25 the following information for each different type of luminaire required on the Contract: <br /> 26 <br /> 27 The fourth paragraph (up until the colon) is revised to read: <br /> 28 <br /> 29 The Contractor shall submit for approval Type 3E Working Drawings in accordance with <br /> 30 Section 1-05.3 for each of the following types of standards called for on this project: <br /> 31 <br /> 32 The fifth paragraph is revised to read: <br /> 33 <br /> 34 The Contractor will not be required to submit shop drawings for approval for light <br /> 35 standards and traffic signal standards conforming to the preapproved plans listed in the <br /> 36 Special Provisions. The Contractor may use preapproved plans posted on the WSDOT <br /> 37 website with a more current revision date than published in the Special Provisions. <br /> 38 <br /> 39 8-20.3(1) General <br /> 40 The following six new paragraphs are inserted after the second paragraph: <br /> 41 <br /> 42 If a portion of an existing communication conduit system is damaged due to the <br /> 43 Contractor's activities, the affected system shall be restored to original condition. <br /> 44 Conduit shall be repaired. Communication cables shall be replaced and the <br /> 45 communication system shall be made fully operational within 24 hours of being <br /> 46 damaged. <br /> 47 <br /> I <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />