My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 Blended hydraulic cement shall be either Type IP(X)(MS), Type IS(X)(MS), Type <br /> I 2 IT(PX)(LY), Type IT(SX)(LY), or Type IL(X) cement conforming to AASHTO M 240 or <br /> 3 ASTM C 595, except that the portland cement used to produce blended hydraulic <br /> 4 cement shall not contain more than 0.75 percent alkalies by weight calculated as Na20 <br /> 5 plus 0.658 K20 and shall meet the following additional requirements: <br /> I6 <br /> 7 1. Type IP(X)(MS) - Portland-Pozzolan Cement where (X) equals the targeted <br /> 8 percentage of fly ash, the fly ash is limited to a maximum of 35 percent by <br /> I 9 weight of the cementitious material; (MS) indicates moderate sulfate <br /> 10 resistance. <br /> 11 <br /> I 12 2. Type IS(X)(MS) - Portland Blast- Furnace Slag Cement, where: (X) equals the <br /> 13 targeted percentage of ground granulated blast-furnace slag, the ground <br /> 14 granulated blast furnace slag is limited to a maximum of 50 percent by weight <br /> 15 of the cementitious material; (MS) indicates moderate sulfate resistance. <br /> 16 <br /> 17 3. Type IT(PX)(LY), where (PX) equals the targeted percentage of pozzolan, and <br /> 18 (LY) equals the targeted percentage of limestone. The pozzolan (PX) shall be <br /> 19 Class F fly ash and shall be a minimum of 25% and a maximum of 35%. (LY) <br /> 20 shall be a minimum of 5% and a maximum of 15%. Separate testing of each <br /> 21 source of fly ash at each proposed replacement level shall be conducted in <br /> I22 accordance with ASTM C 1012 at the storage temperature prescribed in <br /> 23 Section 9.3 of the test procedure, as well as at a storage temperature of 5.0 ± <br /> 24 2.0 °C. Expansion at 1 year shall be 0.10% or less for each test temperature. <br /> 1 25 <br /> 26 4. Type IT(SX)(LY), where (SX) equals the targeted percentage of slag cement, <br /> 27 and (LY) equals the targeted percentage of limestone. (SX) shall be a <br /> I 28 minimum of 30% and a maximum of 50%. (LY) shall be a minimum of 5% and <br /> 29 a maximum of 15%. Separate testing of each source of slag at each proposed <br /> 30 replacement level shall be conducted in accordance with ASTM C 1012 at the <br /> I 31 storage temperature prescribed in Section 9.3 of the test procedure, as well as <br /> 32 at a storage temperature of 5.0 ± 2.0 °C. Expansion at 1 year shall be 0.10% <br /> 33 or less for each test temperature. <br /> I 34 <br /> 35 5. Type IL(X), where (X) equals the targeted percentage of limestone, and shall <br /> 36 be a minimum of 5% and a maximum of 15%. Type IL(X) shall only be used <br /> 37 with either 25% to 35% replacement with Class F fly ash, or with 30% to 50% <br /> I38 replacement with slag cement. Separate testing of each source of fly ash or <br /> 39 slag at each proposed replacement level shall be conducted in accordance <br /> 40 with ASTM C 1012 at the storage temperature prescribed in Section 9.3 of the <br /> I41 test procedure, as well as at a storage temperature of 5.0 ± 2.0 °C. Expansion <br /> 42 at 1 year shall be 0.10% or less for each test temperature. <br /> 43 <br /> I 44 The first sentence of the second paragraph is revised to read: <br /> 45 <br /> 46 The source and weight of the fly ash or ground granulated blast-furnace slag shall be <br /> I 47 certified on the cement mill test report or cement certificate of analysis and shall be <br /> 48 reported as a percent by weight of the total cementitious material. <br /> 49 <br /> I 50 This section is supplemented with the following new paragraph: <br /> 51 <br /> 52 Limestone shall meet the requirements of AASHTO M 240 or ASTM C 595. <br /> I <br /> I AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.