My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 The last sentence of the second paragraph is revised to read: <br /> ' 2 <br /> 3 Certification for crashworthiness according to NCHRP 350 or the Manual for Assessing <br /> 4 Safety Hardware (MASH) will be required as described in Section 1-10.2(3). <br /> ' 5 <br /> 6 9-35.2 Construction Signs <br /> 7 The first sentence is revised to read: <br /> 8 <br /> ' 9 Construction signs shall conform to the requirements of the MUTCD and shall meet the <br /> 10 requirements of NCHRP Report 350 for Category 2 devices or MASH. <br /> 11 <br /> 12 9-35.7 Traffic Safety Drums <br /> 13 The third paragraph is revised to read: <br /> 14 <br /> 15 Drums and light units shall meet the crashworthiness requirements of NCHRP 350 or <br /> 16 MASH as described in Section 1-10.2(3). <br /> 17 <br /> 18 9-35.8 Barrier Drums <br /> 19 This section including title is deleted in its entirety and replaced with the following: <br /> 20 <br /> 21 9-35.8 Vacant <br /> 22 <br /> 23 9-35.12 Transportable Attenuator <br /> 24 In the first paragraph, the fourth sentence is revised to read: <br /> 25 <br /> 26 The Contractor shall provide certification that the transportable attenuator complies with <br /> 27 NCHRP 350 Test level 3 or MASH Test Level 3 requirements. <br /> 28 <br /> 29 9-35.13 Tall Channelizing Devices <br /> 30 In the sixth paragraph, the last sentence is revised to read: <br /> ' 31 <br /> 32 The method of attachment must ensure that the light does not separate from the device <br /> 33 upon impact and light units shall meet the crashworthiness requirements of NCHRP 350 <br /> 34 or MASH as described in Section 1-10.2(3). <br /> 35 <br /> 36 <br /> I <br /> I <br /> ' AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.